gvtcx

CPG/12663/2025 Provision of essential maintenance for the HVAC system for the British High Commission in Kingston

Foreign, Commonwealth and Development Office Published 30 Jun 2025 Find a Tender

key details

Statuscomplete
Procedurelimited
OCIDocds-h6vhtk-055651

Award

SupplierValueDateStatus
Johnson Controls Building Efficiency Ltd · · active

description

The British High Commission Kingston has been approved OED fundings to conduct essential maintenance for the HVAC system.The chilled water and air handling system continues to fail intermittently, restricting the supply of chilled water to the main office building. With the capacity of individual water chillers reduced to approximately 15% and unable to operate at full potential, the system is approaching the end of its operational life.Additionally, the corridor fresh air system and chilled water pressurization systems require comprehensive maintenance, as fluctuating high temperatures in the office significantly affect staff comfort and present health and safety and operational risks. The water pumps further require urgent replacement to enhance system reliability and improve the overall performance of the chiller.Maintenance services are urgently required to replace the necessary parts, disassemble compressor No.2 to repair refrigerant leaks identified during Johnson Controls’ emergency 11 – 17 March 2025 visit, and install replacement water pumps.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
30 Jun 2025 Contract details (UK7) Procurement Act 2023 036259-2025

more from Foreign, Commonwealth and Development Office

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.