ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to
key details
| Status | complete |
|---|---|
| Region | South East |
| Procedure | direct |
| OCID | ocds-h6vhtk-054e02 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Lührfilter GB Ltd | · | · | active |
description
The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date.
Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Jun 2025 | Contract details (UK7) | Procurement Act 2023 | 032847-2025 |
more from THE PIRBRIGHT INSTITUTE
- Brooksby Incinerator PLC Systems and Scada Modifications · 16 Jun 2026
- Rental of Containerised/Trailer Steam Boiler House · 5 Jun 2026
- Supply of updated Stage 3 mechanical & civils design for Site Steam Upgrade project (inc project support). · 5 Jun 2026
- Filters for 2026 for use across all bio protection systems · 25 Mar 2026
- Ultra, High-speed, & Bench Top centrifuges · 21 Jan 2026
- QIAcuity One, 5plex Platform Device · 21 Jan 2026
- Benchtop centrifuge replacement · 21 Jan 2026
- XPR105MCP balance · 21 Jan 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.