ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to

THE PIRBRIGHT INSTITUTE Published 17 Jun 2025 Find a Tender

key details

Statuscomplete
RegionSouth East
Proceduredirect
OCIDocds-h6vhtk-054e02

Award

SupplierValueDateStatus
Lührfilter GB Ltd · · active

description

The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date.

Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
17 Jun 2025 Contract details (UK7) Procurement Act 2023 032847-2025

more from THE PIRBRIGHT INSTITUTE

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.