Controls and BMS package to enable the operation and monitoring of the CHP LTHW heat recovery system
key details
| Status | complete |
|---|---|
| Region | South East |
| Procedure | direct |
| OCID | ocds-h6vhtk-054dfb |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| SCHNEIDER ELECTRIC LIMITED | · | · | active |
description
The CHP LTHW Heat Recovery Project is to enable heat generated from the CHP as low temperature hot water to offset steam production used for heating and hot water within the Plowright building. Utilising the available LTHW provides a significant energy saving and delivers maximum efficiency from the CHP that operates onsite.
Existing controls and BMS operate on the Schneider Electric platform. For continuity and standardisation, it is required that the controls and BMS package to operate and monitor the heat recovery system is via the existing Schneider system.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Jun 2025 | Contract details (UK7) | Procurement Act 2023 | 032836-2025 |
| 24 Jun 2025 | Contract change (UK10) | Procurement Act 2023 | 034803-2025 |
more from THE PIRBRIGHT INSTITUTE
- Brooksby Incinerator PLC Systems and Scada Modifications · 16 Jun 2026
- Rental of Containerised/Trailer Steam Boiler House · 5 Jun 2026
- Supply of updated Stage 3 mechanical & civils design for Site Steam Upgrade project (inc project support). · 5 Jun 2026
- Filters for 2026 for use across all bio protection systems · 25 Mar 2026
- Ultra, High-speed, & Bench Top centrifuges · 21 Jan 2026
- QIAcuity One, 5plex Platform Device · 21 Jan 2026
- Benchtop centrifuge replacement · 21 Jan 2026
- XPR105MCP balance · 21 Jan 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.