Modern Methods Construction Feasibility Study for New Build Housing Pilot- Poleglass - Belfast Region
key details
| Status | planning |
|---|---|
| Category (CPV) | 44211000 +6 more |
| Region | Northern Ireland |
| OCID | ocds-h6vhtk-050d86 |
description
The NIHE is undertaking a feasibility study for ‘New Build Housing.’ This study will investigate and compare different types of Construction including Modern Methods of Construction (MMC) and a traditional approach. The MMC options include volumetric systems, panelised systems, ICF and site based versions however other versions of MMC not listed will be considered for inclusion.
| 1.2 | The feasibility study will provide the Employer (NIHE) with design solutions that are robust and cost effective and that the NIHE could potentially adopt for the future re-development of demolished or disused housing stock. |
| 1.3 | Feasibility Study Objectives: |
| • | To compare the performance of different construction methods that will meet statutory requirements and the needs of the NIHE as a minimum by providing warm, dry, robust dwellings that are quick to erect and easy to maintain. |
| • | To provide comparable cost information on the prescribed types of MMC which can be directly compared to traditional masonry construction, to inform the NIHE in identifying the building approach that best meets its needs. |
| 1.4 | As part of the feasibility study, the NIHE is asking input from the industry to aid the comparison process between the differing methods and inform the end result for the provision of housing to a site at no.s 2-4 Good Shepherd Road, Belfast. The proposal will comprise of 3no. 2 bedroom, 3 person, terraced units and 1 no. 2 bed, 3 person detached fully accessible single storey unit. The site specific information, layouts and performance specification will be provided by the NIHE. |
| 1.5 | The Consultant is responsible to the Employer for the provision of detailed information, as described in this brief, regarding their specialist building method and the performance thereof. |
| Feasibility Study Outputs | |
| 1.6 | The employer will provide a performance specification for the provided site plan, floor plans, elevations and sections upon appointment. To fulfil the objectives of the feasibility study, the Consultant will be required to provide:- |
| • | Detailed description of the type of MMC being proposed and its specific benefits for comparative purposes. |
| • | Design of the structure, materials and finishes, based on the layouts to be provided |
| • | Detailed information to be provided regarding the extent of the works to be completed on site to enable delivery of the offsite product. |
| • | Proposed u-value calculations for walls, floors and roofs, for the unit design provided. |
| • | Proposed programme in the form of a Gantt chart or similar, for the building as a whole, from design stage, through to manufacture (if applicable), to construction on site and completion. |
| • | Life cycle costs estimate. |
| • | Estimated cost of construction, excluding the cost of groundworks, foundations, statutory fees and professional design fees with the budget cost estimate also for the scheme proposed to attain Passivhaus (PH) standard. |
| • | Carbon performance information and figures for embodied, operational and circular. |
| Quality, Technical Standards and Compliance | |
| 1.7 | The dwelling designs should meet the following standards: |
| • | Partially or fully prefabricated off-site and delivered to the client specification as a minimum. |
| • | Construction detailing to meet the standards of the current N.I. Building Regulations as a minimum, unless otherwise stated. |
| • | Target SAP to meet Part F1 as a minimum for standard unit and option to meet Passivhaus standard if available for PH option. |
| • | DER (dwelling emission rate) to meet or exceed TER (target emission rate) in accordance with the Building Regulations of NI.* |
| • | To attain airtightness target of max 5 m3/(h.m2) at a pressure difference of 50 Pascals and for the PH option, Air permeability target of 0.6 ACH 50 pa in accordance with PH criteria. |
| • | Provision of intermittent ventilation or whole house mechanical ventilation system suitable for the proposed air permeability target. |
| • | NIHE provided performance specification. |
| • | An estimated off-site production of less than 6 months if applicable. |
| • | Low maintenance solution so as to maintain the fabric of the building and the fixtures in a cost effective manner. |
| • | Warranties: Details to be provided regarding warranties / accreditations, held by the proposed system. |
| • | Full compliance with all relevant, current, environmental legislation. |
Cost Summary to be provided in accordance with SMM7 and set out within the template to be provided. Any assumptions are to be listed and breakdown of miscellaneous or sundry items to be provided.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 7 May 2025 | Preliminary market engagement (UK2) | Procurement Act 2023 | 019256-2025 |
more from Northern Ireland Housing Executive
- Supply and Delivery of Digital Tablets and Associated Accessories · £1,740,000 · 23 Jul 2026
- Renewal of Autodesk Software Licences and Maintenance and Support · £300,000 · 22 Jul 2026
- Provision of Energy Performance Certificates · £84,000 · 21 Jul 2026
- Supply and Delivery of Personal Protective Equipment and Clothing · £907,998 · 20 Jul 2026
- Response Maintenance & Improvement - Mid Ulster/S Area & Mid & East Antrim · £95,931,041 · 3 Jul 2026
- Grounds Maintenance · £35,781,068 · 3 Jul 2026
- P1171 - Provision of a Specialist Security Service · £120,000 · 22 Jun 2026
- P1368 - Professional Services (all stages from survey through to completion of works on site) in relation to Multi-Element Improvements to 4 No 'Grade B Listed Properties' at Joy Street and Hamilton Street, Belfast · £100,000 · 18 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NUNCON - Modular Design and Build - Project Reference: Boundary Paddocks · Nuneaton & Bedworth Borough Council
- Timber Outbuildings · The State Hospitals Board for Scotland · £60,000
- Ysgol Bod Alaw - Cylch Meithrin - Supply of Modular Double Classroom Accommodation incl · Conwy County Borough Council
- GR/AH/ Domestic Residential Property Modular Extension · Bristol City Council · £85,000
- Supply and Lease of Modular Buildings · UK Industrial Fusion Solutions Limited · £1,500,000
- Supply and installation of 3no Modular Buildings at Alt Bridge School · Knowsley Council · £1,400,000
- UPS WP2- GRP Enclosure - AWARD · CPI (Centre for Process Innovation)
- Meopham School - 2023 Portakabin batch temp classroom rental during newbuild construction · KENT COUNTY COUNCIL · £281,918
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.