Holford Drive, Perry Barr Highway Infrastructure Works

Birmingham City Council Published 12 Aug 2025 Find a Tender

key details

Value£1,400,000 (£1,680,000 inc. VAT)
Statuscomplete
Category (CPV) 45233100 +2 more
RegionWest Midlands
Deadline29 Apr 2025
Procedureopen
OCIDocds-h6vhtk-04ff1c

Award

SupplierValueDateStatus
McPhillips (Wellington) Limited · · active

description

For the Holford Drive, Perry Barr highway infrastructure works.

The proposed works include improvements along Holford Drive to provide additional road space to provide right/left turn lanes at Aldridge Road traffic signal junction, right turn lane into the new high school and footway pedestrian space on both sides of the highway. Limit waiting along the highway to prevent traffic restrictions to the newly provided traffic lanes.

The scope of the works includes:

Improvements to Holford Drive to provide an additional traffic lane on the approach to Aldridge Road by widening into the former Midland Chrome Plating site and widening of the existing carriageway on the approach to the Holford Household Recycling Centre.
Conversion of the Holford Drive arm traffic signals to allow a Toucan crossing in the future for a proposed cycle route on Aldridge Road.
Resurfacing of the carriageway over the scheme extents to the new highway alignment.
Alterations and provision of new drainage for the new highway alignment.
Construction of a new 3m wide footway on the southern side of Holford Drive from Aldridge Road to the school.
Removal and replacement of the existing fence and wall forming the boundary to the former Midland Chrome Plating site for the new highway alignment.
Accommodation works to the school access, temporary car park access of the formally Midland Chrome Plating site, Allotments, and private drives for the new highway alignment.
Removal of the existing Zebra crossing outside the school.
Construction of a new footway on the southern side of Holford Drive from the school to the link to the existing footway outside the West Midland Police Custody Suite.
Regrading of the existing embankment to facilitate the above including provision of retaining structure if required.
Alterations and provision of new street lighting for the new highway alignment.
Relining of the carriageway for the new highway layout including Aldridge Road.
Install additional traffic signal equipment on Southbound arm of Aldridge Road and Holford Drive.
Tie-in works to the new access for the recycling centre.
Restrict parking along Holford Drive.
Protection/diversion of services to facilitate the above

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
8 Apr 2025 Tender notice (UK4) Procurement Act 2023 013770-2025
12 Aug 2025 Contract details (UK7) Procurement Act 2023 047974-2025

more from Birmingham City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.