Guildhall Arts Centre Clock Tower Repairs

South Kesteven District Council Published 25 Feb 2026 Find a Tender

key details

Statuscomplete
RegionEast Midlands
Proceduredirect
SME suitableYes
OCIDocds-h6vhtk-04eda0

Awards (2)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is ·.

SupplierValueDateStatus
Hardy Construction shared £78,620 · active
HARDY CONSTRUCTION (STAMFORD) LIMITED shared £78,620 · active

description

Following detailed inspection and investigation of the timber structure of the Grantham Guild Hall Arts Centre clock tower by our consultant, William Saunders, it is apparent that significant repairs are now required to the timber finishes and structural timbers of the clock tower. This inspection was carried out from the scaffolding that had been erected for the roof repairs works which are currently underway.

To ensure that the timber can be cut out and replaced safely and without affecting the structural stability of the clock tower, a bracing structure made up of scaffolding has to be installed within the clock tower so that the timber pillars are restrained and supported from movement whilst the repairs are carried out.

The scope of the additional repairs has been drawn up by our consultant and priced by contractor Hardy Construction due to the urgency of carrying out the work. The works will address the identified issues and provide a solution that will maintain the structural integrity of the clock tower. The quotation for the works is £78,620.00.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
17 Mar 2025 Transparency notice (UK5) Procurement Act 2023 009568-2025
17 Mar 2025 Contract details (UK7) Procurement Act 2023 009573-2025
25 Feb 2026 Contract change (UK10) Procurement Act 2023 016942-2026

more from South Kesteven District Council

all contracts from this buyer →