New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath

Tai Tarian Ltd Published 4 Dec 2024 Sell2Wales

key details

Value£5,500,000
Statusactive
Category (CPV) 45211000 +5 more
RegionWales
Deadline13 Jan 2025
Procedureopen
OCIDocds-h6vhtk-04a523

description

Tai Tarian is seeking to award a Contract for New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath, including managing demolition within an occupied area, to support Tai Tarian in the delivery of its development programme.

The work comprises of the demolition of 2 existing properties to form access for the construction of 12 houses and 10 apartments and associated external works, drainage and incoming services.

Tenderers should note that a site visit may be made at any time. Tenderers are responsible for obtaining any further information including inspection of the site (and will have deemed to have done so) to ensure sufficiency of your Tender.

Tenderers must complete the Contract Sum Analysis (Appendix 2 – Contract Sum Analysis) in the format provided. A breakdown of the external works costs and preliminaries is also required.

Collateral warranties will be required from all designers and will only be accepted in the format contained in Appendix 1 – Contract Documentation.

Tenderers are reminded that it is expected that the Tenderers proposals will mirror the Employers Requirements. Any alterations must be clearly identified.

A S104 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums.

It is anticipated that a S278 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums.

The client has commenced with the SAB application, and it is hoped that this will be in place prior to signing of contracts. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees but can exclude any surety costs or commuted sums.

Tenderers should note that the specification documents must be complied with fully and no deviation from the listed items will be accepted, unless agreed with Tai Tarian prior to installation.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
2 Oct 2024 Prior information notice (F01) Earlier regulations 031588-2024
20 Nov 2024 Contract notice (F02) Earlier regulations 037454-2024
4 Dec 2024 Corrigendum (F14) Earlier regulations 039015-2024

more from Tai Tarian Ltd

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.