gvtcx

Port of Dover Maintenance Dredging 2024-2028

Dover Harbour Board Published 21 Feb 2024 Find a Tender
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Statusactive
Category (CPV) 98360000
RegionSouth East
Deadline15 Mar 2024
Procedureopen
OCIDocds-h6vhtk-043ba5

description

The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt.

With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010.

Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor.

Pre-dredge surveys to be carried outby Employer using a multi-beam echo sounder, resulting in near total seabed coverage, intermediate or during dredge surveys conducted by the contractor will be verified by the Employer.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 Feb 2024 Utilities contract notice (F05) Earlier regulations 005604-2024

more from Dover Harbour Board

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.