Procurement for the Design, Build, Operation and Maintenance of a Solar PV Plant
key details
| Status | complete |
|---|---|
| Category (CPV) | 45251100 +6 more |
| Region | Scotland |
| Deadline | 28 Jul 2023 |
| Procedure | open |
| OCID | ocds-h6vhtk-03d068 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Absolute Solar and Wind Ltd | · | · | active |
description
bp Aberdeen Hydrogen Energy Limited (bpAHEL) is a Joint Venture (JV) between bp and Aberdeen City Council (ACC), secured through a public procurement process. The JV has been created with the purpose of delivering a scalable green hydrogen production, storage and distribution facility (hydrogen refuelling station) in the city. The hydrogen refuelling station will be powered by renewable energy, including a purpose-built Solar PV Plant.
The purpose of this notice is to inform potential bidders of the opportunity to submit a tender to design, build, operate and maintain the Solar PV Plant.
documents
- Procurement for the Design, Build, Operation and Maintenance of a Solar PV Plant , awardNotice
- Procurement for the Design, Build, Operation and Maintenance of a Solar PV Plant , awardNotice
- Procurement for the Design, Build, Operation and Maintenance of a Solar PV Plant , contractNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
6 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 31 May 2023 | Prior information notice (F01) | Earlier regulations | 015321-2023 |
| 29 Jun 2023 | Contract notice (F02) | Earlier regulations | 018516-2023 |
| 25 Jul 2023 | Corrigendum (F14) | Earlier regulations | 021424-2023 |
| 1 Aug 2023 | Corrigendum (F14) | Earlier regulations | 022251-2023 |
| 13 Aug 2025 | Contract award notice (F03) | Earlier regulations | 048348-2025 |
| 13 Aug 2025 | Modification notice (F20) | Earlier regulations | 048383-2025 |
more from bp Aberdeen Hydrogen Energy Limited
- Procurement for the Design, Supply, Installation and Commissioning of Hydrogen Equipment for the Purpose of Production, Compression, Storage and Dispensation of Hydrogen Fuel (“Hydrogen Technology Package”) (Revised Tender) · 26 Sept 2024
- Procurement for the design and Build of a Solar PV Plant · 31 May 2023
- Procurement for the Design, Supply, Installation and Commissioning of Hydrogen Equipment for the Purpose of Production, Compression, Storage and Dispensation of Hydrogen Fuel (“Hydrogen Technology Package”) · 4 May 2023
- Contract Notice: Procurement for the Design, Supply, Installation and Commissioning of Hydrogen Equipment for the Purpose of Production, Compression, Storage and Dispensation of Hydrogen Fuel (“Hydrogen Technology Package”) · 2 May 2023
- Prior Information Notice - Description and Additional Text · 2 Dec 2022
all contracts from this buyer →
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.