gvtcx

Port of Dover Maintenance Dredging 2023

Dover Harbour Board Published 27 Mar 2023 Find a Tender

key details

Statusactive
Category (CPV) 98360000
RegionSouth East
Deadline27 Apr 2023
Procedureopen
OCIDocds-h6vhtk-03b65e

description

The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt.

With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010.

Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor.

Pre and post dredge formal contract surveys using a multi-beam echo sounder, resulting in near total seabed coverage, shall be commissioned by the Employer from an independent survey Contractor.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
27 Mar 2023 Utilities contract notice (F05) Earlier regulations 008860-2023

more from Dover Harbour Board

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.