gvtcx

Supply of and Maintenance Support for new Rolling Stock for Southeastern

SE TRAINS LIMITED Published 8 Nov 2022 Find a Tender

key details

Statusactive
Category (CPV) 34620000 +1 more
RegionSouth East
Deadline9 Dec 2022
Procedureselective
OCIDocds-h6vhtk-03803e

description

The overall objective of this procurement is cost reduction and cost avoidance, through securing the best medium and long-term value fleet solution for the benefit of taxpayers, the Department for Transport, Southeastern and ultimately, Southeastern's customers. We believe that this objective can be secured by procuring new trains to replace a significant quantity of Southeastern's ageing fleet and therefore avoiding the escalating maintenance, repair and leasing costs To meet this objective, the new fleet must be manufactured and introduced into full, unrestricted operational service by October 2027

The quantity of vehicles in the core order will be between 350 and 570, with an option for up to 70 additional vehicles (these quantities have been calculated using an assumed 20m vehicle length). The precise number in the core order will be determined once tenders for supply, financing and maintenance have been received and the business case for new trains is completed. The business case will inform and determine which fleet or fleets are to be replaced and therefore will establish the final quantity for the core order In addition, follow-on options may be sought, to allow the fleet to be increased over time, depending on recovery of demand post pandemic

Bidders will be required to propose a design based on an established platform, and demonstrate the ability to deliver on-time, obtain acceptance and introduce fleets into service in the UK, evidenced by previous procurements

The key requirements of the new vehicles will include (but not be limited to):

ofull compatibility with Southeastern infrastructure (excluding High Speed 1 infrastructure)
ofull compliance with all applicable accessibility regulations (PRM NTSN)
ointeriors suitable for metro & mainline operation
otoilets
oair conditioning
oinclusion of options for traction batteries with capability for operation in depots and sidings without the need for external power supply, and with the capability to operate on the main line where power supply is not available due to isolations or incidents, or for non-electrified line sections of up to 20 miles

Southeastern is seeking a new fleet manufactured, maintained and operated with sustainability in mind, and with reduced carbon footprint, energy usage and embedded carbon.

Bidders will also be required to supply initial spares, special tools and equipment to support staff training

Bidders will be required to provide ongoing maintenance support by way of a materials supply and technical support agreement, whole life cost guarantees and a performance regime

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
8 Nov 2022 Utilities contract notice (F05) Earlier regulations 031623-2022

more from SE TRAINS LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.