(NU/1612-4) Supply of High Performance End of Line Test Equipment

Newcastle University Published 13 Aug 2021 Find a Tender
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Statuscomplete
Category (CPV) 31000000
RegionNorth East
Procedureselective
OCIDocds-h6vhtk-02d45b

Awards (4)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is ·.

SupplierValueDateStatus
Marposs Limited shared £922,456 29 Jun 2021 active
Marposs Limited shared · · active
Weiss Technik UK Ltd shared £922,456 29 Jun 2021 active
Weiss Technik UK Ltd shared · · active

description

The Driving the Electric Revolution (DER) is an Innovate UK (IUK) Challenge program to support UK industry to seize the economic opportunities from the global transition to clean technologies and electrification. The programme will help businesses across numerous sectors including transport, energy, construction and agriculture to invest and work together to capitalise on the UK’s strengths in this technology.

The DER program vision is “To make the UK globally recognised as the centre of excellence in PEMD manufacturing processes”.

As part of that program, Newcastle University has been awarded a large grant to establish a new DER Innovation Centre (DER-IC) in the North East of England. The NE DER-IC will concentrate on the prototyping and scale-up of power electronics and electric motors.

This tender was focussed on the motor manufacturing aspect and the purchase of relevant equipment to manufacture and test electric motors. There are six separate equipment systems being tendered in this ITT, as follows:

  • i)Leak Test system (Section 3.2)
  • ii)Magnetic Scanner system (Section 3.3)
  • iii)Motor test Dynamometer/EOL Tester (Section 3.4)
  • iv)Vibration Shaker system (Section 3.5)
  • v)Environmental Test Chamber System (Section 3.6)
  • vi)Environmental Thermal Stock Chamber system (Section 3.7)

The scope was for the supply, delivery, and commissioning of each system as detailed in the ITT, with after sales support, a minimum 12 months parts and labour warranty and maintenance. This should include on completion of installation a complete set of operating and maintenance documents.

This requirement was only advertised to all Sellers appointed to Lot 5: High Performance End of Line Test of (NU/1612) Flexible Electric Machine Assembly Line Dynamic Purchasing System (OJEU Ref: 2020/S 229-565620).

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
13 Aug 2021 Contract award notice (F03) Earlier regulations 019692-2021
13 Aug 2021 Award (award) · faa7db53-63b7-4523-a5fa-432c8ba5a48b-460490

more from Newcastle University

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.