gvtcx

Special Inspection Notice 119 (SIN119) Remedial Works Framework - Kent and Sussex Routes

Network Rail Infrastructure Ltd Published 13 Apr 2021 Find a Tender
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Statuscomplete
Category (CPV) 45234115
RegionSouth East
Procedureselective
OCIDocds-h6vhtk-02a5ca

Awards (2)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is ·.

SupplierValueDateStatus
Amaro Signalling Limited shared · · active
Fuse Rail Limited shared · · active

description

Network Rail has carried out a procurement process in accordance with the Negotiated Procedure with Prior Call for Competition under the Utilities Contracts Regulations 2016.

This Framework is to complete the necessary remedial works associated with the SIN119 notice issued by the ORR. This includes physically verifying that location cases are connected to earth via an earth rod/mat/another source and exposed live parts are mitigated against. Subsequently, the integrity of the earth connection and resistance to earth of the rod/mat/another source shall be verified for compliance against the relevant safety standards.

  1. contractors have been appointed as the Principal Contractors under this Framework. The award duration is 2 years with the option to extend by 1 year.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
13 Apr 2021 Utilities contract award (F06) Earlier regulations 007769-2021

more from Network Rail Infrastructure Ltd

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.