HMPPS Leyhill-Heating Loop Replacement A&B Wing-BPRN No.565/22/9463

Ministry of Justice Published 24 Jun 2025 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£995,637
Statuscomplete
Category (CPV) 45216113
RegionSouth West
Deadline11 Jun 2024
Contract start13 May 2025
Contract end31 May 2027
Procedureselective
SME suitableNo
OCIDocds-b5fd17-f6beff2a-6b59-4b08-9db4-57e06c239c44

Award

SupplierValueDateStatus
Kier Construction Ltd £995,637 12 May 2025 active

description

HMP Leyhill has an old copper pipework infrastructure from the plant rooms to the wing and steel heating loops. All pipework feeding the heating's loops are below ground in a vaulted floor with very limited access. This comes up above the floor to the steel heating loop supplying heating to the cells on all spurs to A & B wings. (385 spaces). The pipework is over 40 years old & has worn so thin that it is regularly being perforated & leaking.

Contractors are struggling to access the fractures & are having to cut access hatches into the concrete floor, where they can access the pipework. The pipework is often too thin to affect a repair & must be cut back several times before they are able to make a connection. The repair increases pressure & often cause a further leak a meter along the pipe within a very short period of time.

There have been several leaks recently and as the Living block has no spare electrical capacity for emergency heaters & installing a generator close by would be noisy. Potentially we could be looking at a decant of a complete wing if the infrastructure is not addressed prior to a complete failure.

A constructor has been appointed for the design and build of the project.

This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract.

The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £172,758.43.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Jun 2025 Award (award) · d216fdbb-2a2e-4cf5-afa1-83c429378b01-851233

more from Ministry of Justice

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.