RSSB Supplier Day - Tuesday 21st February - RSSB2502 - T1125 - Reducing the impact of noise on future residents of line-side developments
key details
| Status | planning |
|---|---|
| Category (CPV) | 73200000 |
| OCID | ocds-b5fd17-f49624b7-4748-438b-9ecd-e996e9e84714 |
description
RSSB is holding a Supplier Day on Tuesday 21st February 3pm-4pm here at our offices in London for RSSB2502 - T1125 - Reducing the impact of noise on future residents of line-side developments.
If you would like to attend please email the below email address vy 5pm Monday 20th February:
Shareditt@rssb.co.uk
--
Mixed traffic railways subject local soundscapes to numerous aural intrusions, notably those from train horns, engine idling, and public address systems. For the residents of line-side properties, this operational pulse may rise to nuisance with objectionable frequency, volume, timing, or secondary effects (for example, vibrations). As the prominent public face of the rail industry (and the perceived perpetrators), noise and other environmental complaints are often (mis)directed at Train Operating Companies (TOCs). Consequently, these franchised passenger operators endure the public relations cost of nuisance entombed in the built infrastructure.
Changes to railway operations - for example, increasing the frequency or varying the type of service - can adversely affect line-side communities. Correlating with recent timetable alterations (made to meet greater capacity needs on many urban routes), there has been a notable increase in nuisance complaints from longstanding line-side residents.
Under government instruction to enable new residential developments, Network Rail is disposing of assets at 13 line-side locations. Although a range of guidance exists to mitigate railway-related noise nuisance (notably from CIRIA), there is little clarity as to how far previous developments have followed best practice, and scarce assurance that profit-driven developers will exercise scrupulous diligence in this area. Owing to the necessary haste of these sales, and in the absence of contractual obligation, industry is unable to ensure that developers fully consider the aural impact that current (and likely increasing) levels of rail traffic may inflict on line-side residents.
This research intends to map the existing processes related to railway-specific sound attenuation - prescribing therapy for any communicational shortcomings and remedy for any responsibility deficiencies identified. To do so, the project will review the history of line-side developments and assess the relative success of noise impact assessments undertaken during the planning phase. This learning will establish revised processes, tempered with experience, to inform the 13 line-side developments (each at differing stages of planning) and to positively contribute to the effective long-term management of railway-related noise.
Accordingly, the project team will both develop and deliver consultative advice in the execution of this research. Due to the likely benefit of iterative learning (that is, developing best process through a cycle of engagement, analysis, and review), the project requires a single, cohesive work package.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Feb 2017 | Planning (planning) | · | 92312ffd-7bc7-480a-b390-f2039b209a92-130254 |
more from RAIL SAFETY AND STANDARDS BOARD LIMITED
- T1305 - Codify the impact of professional driving policies and defining best practice guidance · 20 Apr 2022
- T1261 - The use of AI in the Context of Spoken Safety Critical Communications · 27 Jan 2022
- T1273 Optimising drivers' use of audible warnings in all potential warning scenarios · 24 Nov 2021
- T1244 Characterising the Pantograph and Overhead Contact System · 20 Jan 2021
- T1223-02 Wheelset Coating Systems and Good Practice Guidance · 26 Nov 2020
- T1210 ADHERE Sander quality and performance criteria framework · 25 Aug 2020
- T1219-02 RESILIENT: Anti-icing and de-icing mitigations for pantograph and Overhead Line Equipment · 29 Jun 2020
- T1214 DECARB: 21st Century DC electrification infill · 5 Jun 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Provision of Value of a Life Year Research (VOLY): Lot 3 Supplementary Empirical Research · DfTc - Department for Transport · £182,737
- Provision of Value of a Life Year Research (VOLY): Lot 2 Advice on the maintenance and application of the values · DfTc - Department for Transport · £90,190
- TANL3071 - Provision of Value of a Life Year Research (VOLY): Lot 1 Primary Research · DfTc - Department for Transport · £1,298,901
- SISAC OBC WP2/4 · NCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC WP1 · NCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC 2/4 · NCCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC WP2/3 · NCC Operations Ltd T/A NCC - Innovating for Industry
- W785b - A Public Realm and Transport Framework · DERBY CITY COUNCIL · £27,479
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.