Fit Out - Lift Steelwork & Glazing -WP12.2.1 - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV Published 19 Apr 2023 Contracts Finder

key details

Value£20,000,000
Statusactive
Category (CPV) 42416100 +6 more
RegionLondon
Deadline1 May 2023
Contract start1 Jul 2024
Contract end31 Mar 2028
SME suitableYes
OCIDocds-b5fd17-f4759086-a1fa-4b14-bb7f-4c18423b40ed

description

WP12.2.1 - HS2 Lift Steelwork & Glazing

Scope of Work:

The OOC Station HS2 Scenic Lifts Fit Out package consists of the primary steelwork and cladding to the OOC HS2 station scenic lifts and comprises of the following scope:

Detailed design, supply and installation of primary steelwork and glazed cladding to 12 scenic + 3 interchange lifts in the HS2 station platforms and concourse area, including provision of brackets, supports and required service holes to interfacing contractors.
Fully coordinated design with MEPH services, advertising, signage, station common components and lifts contractor, including design of brackets, supports and allowance for service holes.
Provide RIBA 5 design and construction drawings including connection details, fabrication drawings, general arrangements, and elevation drawings for construction.

Additional information: No Documentation is included at this point.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
19 Apr 2023 Tender (tender) · ec71481a-7d15-4ac2-bf22-15bb417d4c45-637225

more from Balfour Beatty VINCI Systra JV

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.