Purchase of Power Tools for the Conservation of HMS Victory

THE NATIONAL MUSEUM OF THE ROYAL NAVY Published 26 Jul 2022 Contracts Finder

key details

Value£100,000
Statuscomplete
Category (CPV) 43800000
Deadline31 Aug 2022
Contract start15 Sept 2022
Contract end15 Sept 2026
Procedureopen
SME suitableYes
OCIDocds-b5fd17-f3d835c6-1862-4ac2-97a9-d83936008952

Award

SupplierValueDateStatus
T.W. ENGINEERING COMPANY LIMITED £58,500 5 Oct 2022 active

description

The next decade is a key period in the 260 year - long story of HMS Victory's service and survival. Over the next 10 years the National Museum of the Royal Navy (NMRN) are leading on the conservation of HMS Victory to ensure the long-term preservation of a world-class historic vessel. The aim of the HMS Victory Conservation Project is to deliver a fully-conserved ship, able to survive in an open environment, and in a condition to survive for the next 50 years without major work beyond a programme of planned maintenance.

Overview

The conservation work includes the replacement of all external and some internal planking and structural timber elements. New power tools are needed to enable this work to take place. This work will include;

Stripping existing fittings and planking (externally and internally)
Repairs to hull frames
Producing laminated planking/large knees for external/internal for the hull
Fitting and fixing planking and large knees as well as other replacement items internally/externally
Fitting and fixing of iron work, as well as other similar fittings internally/externally to the ship.

The first phase of the hull conservation project takes place in the ships midships for a minimum of 4 years before work continues to the Fore/Aft of the ship.

Appendix 1 lists our preferred power tools, this has been done to meet quality standards required for the work to be carried out. Alternative tools must either meet or exceed quality of listed equipment.

Completed pricing schedule (Appendix 1 - Excel) including a firm price for each listed tool in Stage 1; provisional price for Stage 2 and delivery price.

Pricing schedule to also include warranty details for each tool and lead times for delivery of each tool/machine to site within Portsmouth Naval Base.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 Oct 2022 Award (award) · d0137813-189b-492d-8c14-76d9802bc8af-578539

more from THE NATIONAL MUSEUM OF THE ROYAL NAVY

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.