Research to assess the economics of coastal change management in England and to determine potential adaptation pathways for a sample of exposed communities
key details
| Value | £66,667 |
|---|---|
| Status | active |
| Category (CPV) | 73000000 |
| Region | London |
| Deadline | 8 Nov 2017 |
| Contract start | 20 Nov 2017 |
| Contract end | 31 May 2018 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-f2da2262-5147-49f7-a92b-8ed67f3c2b0a |
description
The Adaptation Sub-Committee (ASC) of the Committee on Climate Change (CCC) is the Government's statutory advisers on preparing for climate change. One of the primary risks from climate change relates to sea level rise and the consequential increases in the chance of coastal flooding and the rate of coastal erosion to vulnerable English coastlines (ASC 2016). The combined effects of erosion and coastal flooding are considered together in this specification as 'coastal change'.
A series of Shoreline Management Plans are in place for the entire length of the English coastline. These set out the intended approaches to managing coastal change over the short (to around 2025), medium (to the 2050s) and the long term (to 2100), described by one of four high-level policy options for each of these three planning timescales or 'epochs':
| • | No active intervention - Flood or coastal erosion defences are not introduced, maintained or enhanced. |
| • | Hold the (existing defence) line - Flood or coastal erosion defences are built, maintained, replaced and/or enhanced so that the position of the shoreline remains where it currently is. |
| • | Managed realignment - Managing the movement of the shoreline to allow or restrict erosion or flooding in certain areas. This is usually done in low-lying areas, but may occasionally apply to cliffs. |
| • | Advance the line - New defences are built on the seaward side of existing defence lines. |
The ASC would like to assess the economics and feasibility of delivering these interventions as set out in the SMPs over the short, medium and long term. For example the ASC has previously concluded that (see ASC 2017, page 119):
| • | The amount of managed realignment of the coastline is still not in line with delivering Shoreline Management Plan aspirations for the 2030s. (Note: based in part on ASC 2013, see from page 100). |
| • | It is not known whether actions in Shoreline Management Plans constitute a viable approach to coastal adaptation in the long-term nor how they interface with other national or local plans. |
This project will therefore aim to conduct a national cost-benefit assessment of coastal change interventions for the English coastline, and to supplement this with a series of case studies looking at adaptation pathways for specific communities exposed to coastal change in the short, medium and longer term.
*** Please see specification **
Additional information: Bids should be sent in time in time for receipt by 5pm on Wednesday 8th November 2017. Potential bidders are requested that they must make clear any issues they have with these standard terms and conditions by the 1st November 2017.
documents
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/2940a0c6-6ef9-4c4a-9c3e-b76d867b8fa1 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/9c6be6e1-d423-4269-89b3-14e62e254a49 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/ce890f10-54ac-4444-aa7b-69bb19a21328 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/df16539a-9314-404c-b0b5-1f28f6523d82 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 20 Oct 2017 | Tender (tender) | · | df16539a-9314-404c-b0b5-1f28f6523d82-177529 |
more from The Committee On Climate Change
- Scoping study to assess the resilience of the UK's cold supply chain to rising and extreme temperatures · £80,000 · 17 Apr 2024
- Developing spatial indicators of vulnerability to the impacts of climate change in the UK. · £50,000 · 4 Mar 2024
- Residential Buildings Assumptions · £41,500 · 18 Jan 2024
- Early engagement notice - Risks to health and the health service due to extreme heat · 18 Jan 2024
- Early engagement notice - Heat risks to the urban environment and health · 17 Jan 2024
- Early engagement notice - Interventions for building economy-wide water resilience · 10 Jan 2024
- Early Engagement Notice - Assessment of climate risks to UK cold-supply chains · 13 Dec 2023
- Climate Change Risk Assessment 4 - Technical Report · £500,000 · 7 Dec 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ACAS27482 - MH Good Practice tender · UK SHARED BUSINESS SERVICES LIMITED · £69,730
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Award of Effective ventilation guidance and practice to mitigate the indoor airborne transmission... · Scottish Government · £9,826
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.