Thames Tideway Tunnel - C405 Main Works West - Transformer Brackets

key details

Value£1
Statuscomplete
Category (CPV) 45262670
RegionLondon
Deadline10 Dec 2019
Contract start13 Dec 2019
Contract end18 Dec 2019
Procedureopen
SME suitableNo
OCIDocds-b5fd17-eb648373-dcf4-4007-9662-1ddd56e4cd7c

Award

SupplierValueDateStatus
not named £0 11 Dec 2019 active

description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

Section 4: Scope of Works

Supply only -

22No. transformer brackets as detailed in the drawing number 3350-BAMNU-CARRR-450-CZ-DR-000021 P01

Supply the nuts, bolts and washers required to assemble the units. Tunnel fixings (Hilti HUS3 H10) should be excluded from your offer.

Steel to be supplied as self-colour.

To be delivered disassembled.

Delivery will be to our Carnwath road site address or our West Drayton storage yard in in accordance will delivery rules and procedures.

Drawings

3350-BAMNU-CARRR-450-CZ-DR-000021 P01

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

Cost

Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

TBC

Additional information: TBC

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
11 Nov 2020 Award (award) · bac9fa42-a96f-4030-8b0c-300e1fa15c7f-392355

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.