gvtcx

An Evaluation of the Role of the Principal Designer (PD)

Health & Safety Executive Published 17 Dec 2020 Contracts Finder

key details

Value£40,000
Statusactive
Category (CPV) 71500000 +4 more
Deadline7 Jan 2021
Contract start17 Jan 2021
Contract end31 Mar 2021
Procedureopen
SME suitableYes
OCIDocds-b5fd17-e493a1a7-63f4-4b02-ae17-dad977ed182b

description

The Construction Design and Management Regulations 2015, also known as CDM Regulations or CDM 2015, came into force on 6 April 2015. They govern the way construction projects of all sizes and types are planned in Great Britain. The principal designer role was introduced by the CDM 2015 regulations. They are appointed by the client to take the lead in planning, managing, monitoring and coordinating health and safety during the pre-construction phase (design and planning stage) of a project.

Principal designers have an important role in influencing how risks to health and safety are managed throughout a project. Design decisions made during the pre-construction phase have a significant influence in ensuring the project is delivered in a way that secures the health and safety of everyone affected by the work.

This review goes above the evaluation that is required by the Post Implementation Review PIR for CDM which focuses on a response to the original Economic Impact Assessment (EIA) and looks at the structural changes that should have occurred within the industry arising from this new role.

One of the principal findings of the PIR was that the anticipated cost savings that were expected to arise from the introduction of the PD had yet to materialise. Several speculative reasons for this had been put forward. CD Sector needs to have greater understanding of what is driving behaviours in this area and how the role is functioning at present. This is to provide a basis for effective policy development and inform strategic considerations related to wider industry change associated with the Grenfell fire and the creation of a new Building Safety Regulator (BSR).

The aim of the project is to enhance CD's understanding of how the PD role is being embedded within construction projects of all sizes.

Additional information: All tender documents are available via the HSE In-Tend supplier e-procurement portal. All responses and requests for clarification must be submitted via the portal. Registration is free of charge and can be completed via the following link:

https://in-tendhost.co.uk/hse

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
17 Dec 2020 Tender (tender) · 92cea719-a07c-4267-b045-0c11ac7edb6c-401479

more from Health & Safety Executive

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.