Toilet Blocks Complete Refurbishment
key details
| Status | complete |
|---|---|
| Category (CPV) | 45453000 |
| Region | West Midlands |
| Deadline | 6 Oct 2015 |
| Contract start | 7 Oct 2015 |
| Contract end | 31 Mar 2016 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-e1c3c837-adc8-11e6-9901-0019b9f3037b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Igloo FM Facilities Management & Support Services | £0 | 5 Oct 2015 | active |
description
Refurbishment works of all toilet blocks within the school.
Refurbishment will consist of, but not be limited to the following;
| • | Preliminaries, survey and facilitating works |
| • | Removal of all existing flooring and sub-bases in all toilet areas and replace with new bases, edges, coving and appropriate floor covering materials – finishes to be agreed with the Client (Fairway Primary) and EC MAT |
| • | If required, undertake camera survey of all drains to confirm integrity of structure and condition |
| • | Removal of all existing toilet cubicles, doors and partitions and replace with new installations – finishes and final configurations to be agreed with the Client and EC MAT |
| • | Removal of all existing items of sanitary ware fixtures and fittings and replace with new and to be self-contained / boxed in / integral to overall design – to include finishing surfaces, cupboards, service access, etc.- finishes and final configurations to be agreed with the Client and EC MAT |
| • | Install new doors and architraves, to all doors to include ironmongery, push plates, kick plates, handles, etc. |
| • | Removal of and/or relocate all existing plumbing, heating and electrical services with new and where possible, to be self-contained / boxed in |
| • | To remove all existing dilapidated heaters / and provide all new wall mounted heaters, boilers, automated hand dryers and radiators – Final quantities and locations to be agreed |
| • | Provide new lighting installations in all toilets to ensure appropriate levels and emergency fittings as required – contractors are to propose most energy efficient appliances and fittings |
| • | To board, skim and decorate all walls and ceilings as required – final colour scheme to be agreed with Client and EC MAT |
| • | To board over ceilings / raise up if possible and redecorate - final colour scheme to be agreed with Client and EC MAT |
| • | Install tiling to ‘half way up’ around all walls in all toilets – final colour scheme to be agreed with Client and EC MAT |
| • | Where found, remove all existing old and damaged extraction systems and services and install new with appropriate special flow and extraction rates – these may be linked to lighting sensors |
| • | Install as and where required new and additional services to include plumbing, heating electrical works to fuse boards, Boilers and mains services |
| • | IMPORTANT NOTE: all modification and/ replacement works to electrical, gas and water supplies will fully comply with statutory, industry and regulatory requirements – certification of all installations is required |
| • | All works to include disposal off site of all materials as required |
| • | Any on site storage requirements may be agreed with the Client, however, Contractor(s) included a sum for external separate storage for tools, equipment and supplies |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 13 Oct 2015 | Award (award) | · | ocds-b5fd17-e1c3c837-adc8-11e6-9901-0019b9f3037b-76738-ecmatcmf-201516-fair-01 |
more from UNIVERSITY OF WOLVERHAMPTON ENTERPRISE LIMITED
- 25-50 The Provision of Staff Travel Management Services · £1,000,000 · 28 Jul 2026
- 26-21 Digital Backup and Restore Solution · £1,516,119 · 27 May 2026
- 26-09 Green Innovation Corridor - Springfield Campus Blocks A & B (Principal Contractor) · £9,900,000 · 10 Mar 2026
- 26-10 Cyber Security Management Services · £2,337,994 · 6 Mar 2026
- 26-11 Disclosure & Barring Services · £605,558 · 9 Feb 2026
- Apple Mac Estate Management Portal (JAMF) · £95,000 · 13 Jan 2026
- 25-60 Vehicle Hire · £200,000 · 18 Nov 2025
- 25-40 Allied Health Uniforms · £185,199 · 17 Nov 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- SYP - Pioneer Close Phase 2 refurbishment · South Yorkshire Mayoral Combined Authority
- Minor Works Framework · Gentoo Group · £19,620,611
- Planned Programme Works · Albyn Housing Society Limited
- Ceiling Mounted Utilisation Sensors · South London and Maudsley NHS Foundation Trust · £240,000
- SYP - Rotherham Main Street Refurbishment · South Yorkshire Mayoral Combined Authority
- CA16715 - C0 Toilet Refurbishment for Northampton College · Crescent Purchasing Consortium Consultancy Ltd
- Academy - Phase 2 Structural Works · The City of Liverpool College · £350,000
- Refurbishment - Electrical Workshops · The City of Liverpool College · £400,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.