Water Treatment and Sump Pump System Upgrade
key details
| Status | active |
|---|---|
| Category (CPV) | 45252126 +1 more |
| Region | West Midlands |
| Deadline | 13 Dec 2016 |
| Contract start | 1 Feb 2017 |
| Contract end | 30 Apr 2017 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-d0bee33a-092a-41f0-abd4-e3681a1a2e7c |
description
Upgrading existing water treatment plant: the existing water treatment plant & the display unit are to be replaced & upgraded. The installation and replacement works in line with the upgrade shall be carried out by the supplier of the 'Orca' system ProEconomy.
BMS connection of Water treatment System. - Connection of the Copper Silver system with the Hospital's central BMS system in order for the Service engineer to have a full information and visualization of the system's performance at all times, giving him the capability to intervene if needed. Improvement of Water Treatment Service procedure and time. - Examination and redesign of the system for better possible work order or output.
Pipe Flood Detection System. - Examine, propose and design better fail safe mechanisms to prevent flooding due to future pipe failure. Backup of the Electrical Actuator Cut off Valve. The Electrical Actuator Cut Off Valve The system must always : be in good Working Order, have ability to work at all times, be available for Cut off at all times, which makes it a far too important a mechanism to be left without a backup.
Water Temperature Reading. Install a system for reading and recording the temperature of the incoming water into the Copper Silver Disinfection system and introduce that data into the BMS.
Sump Pump System, improve and secure working order. - Provide a clean Sump-pit for pumps to work without damage. Examine, propose and redesign the Sump Pump system with better fail safe mechanisms to prevent flooding due to future pipe failure.
Additional information: Please be aware that Birmingham Children's Hospital has a tender opportunity for Water Treatment and Sump Pump Upgrade works.
The tender documentation can be accessed via Bravo Solutions (no documents will be sent direct from the Trust), the ITT reference and contact details are below:
ITT: itt_3775 - Water Treatment and Pump System Upgrade Running Project - 20592
HELPDESK
Need assistance?
Please contact our Sourcing helpdesk:
Phone: 0800 368 4850
E-mail: help@bravosolution.co.uk
Any difficulties ring accessing please contact the helpdesk and they will be able to help you.
documents
- https://www.contractsfinder.service.gov.uk/Notice/9c8d6161-8746-4898-ac88-c91fc2f688bc , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Nov 2016 | Tender (tender) | · | 9c8d6161-8746-4898-ac88-c91fc2f688bc-117369 |
more from BIRMINGHAM CHILDRENS HOSPITAL
- Air Con Units BWC · 22 Mar 2022
- GE Medical Service Contract · 16 Feb 2021
- Patient First System · 15 Dec 2020
- NIPT Star Liquid-handling station · 15 Dec 2020
- Hologic Panther Analyser · 15 Dec 2020
- sickle cell screening kits and Equip service · 15 Dec 2020
- Maintenance contract Newborn Screening · 15 Dec 2020
- Vmware Licencing · 15 Dec 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Legionella Risk Assessments · Bath and Northeast Somerset, Swindon and Wiltshire STP · £120,000
- UK SBS FM16193 Water Treatment Services · UK SHARED BUSINESS SERVICES LIMITED
- Framework Agreement for Legionella, Consultancy/Monitoring and Maintenance · Northern Housing Consortium Ltd · £23,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.