Shaft Secondary Lining Jumpform System

CVB JV - Costain, Vinci C G P, Bachy Soletanche Published 19 Nov 2018 Contracts Finder

key details

Value£2,500,000
Statusactive
Category (CPV) 45200000
Deadline26 Nov 2018
Contract start4 Feb 2019
Contract end30 May 2021
SME suitableNo
OCIDocds-b5fd17-b95547fd-384f-4f91-ac0e-017cf25ec606

description

CVBJV is the main contractor for the East section of the Thames Tideway project.

There are 5 site in total and 4 sites are being done with a jump form system. The Sites address are:

GREPS

Thames Water Pumping Station

  1. Greenwich High Road

LONDON SE10 8JL

DEPCS

Deptford Work Site

Crossfield Street

LONDON SE8 3PH

EARPS

Earl pumping station

Yeoman street

LONDON SE8 5ET

KEMPF

Glamis Road

St Katharine and Wapping

LONDON E1W 3TD

The 4 shafts are drop shafts between the existing sewers on surface and the tunnels of the new Thames Tideway project. Therefore, they all have a vortex structure, a vortex generator, and a connection to an interception chamber. Sections and elevations are available further in this document in Appendix A.

The lower part of the shaft where the tunnels connect will be already built at the time of the construction. The jumpform system will therefore be used for the construction of the middle and top part of the shaft.

The supplier will provide a jump form system (called shutter hereafter) to cast the secondary lining for the 4 construction site's shafts. The formwork for the lower section where the tunnels connect will be part of a different brief.

The shutter will be a single face arrangement*, suitable to pour 3m lifts, which will allow the pour of the vortex, and fitted with 3 levels of platforms as described in the section 3.2 Shutter Arrangement.

The shutter will be adaptable to the different diameter of the shafts and the different dimensions of the vortex.

The shutter will be able to cope with the different sequence of pour of the vortex generator.

The supply will include:

  • The full design, with optional CAT 3 design check, in accordance with the deliverable in the section 4.2 below.
  • All the hydraulic system required for the "jumping" operation. A solution "pulled" from the top of the shaft, with a strand jack system can be proposed.
  • All the guiding system to control and maintain the shutter within the required 25mm tolerance. Manpower will need to be supplied to supervise the jumping operation, and the checking of tolerances.
  • The design and supply of all the embedded items needed to support the shutter. These items will have to meet the requirement of the permanent work repair procedure.
  • All access within the shutter itself, and working platforms
  • All access ladders and access hatches
  • All the edge protection including the net/tarpaulin/etc to block the view and/or maintain a closed environment
  • The adapted amount of supervision for the assembly and dismantling of the shutter.
  • Spare parts stored on site for the most common failures

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
19 Nov 2018 Tender (tender) · 091eb31f-39db-4ec5-b143-b1e8d42fb939-253239

more from CVB JV - Costain, Vinci C G P, Bachy Soletanche

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.