gvtcx

MA17 - Site Investigation & Anchoring for FOW

Offshore Renewable Energy Catapult Published 24 Jan 2024 Contracts Finder

key details

Value£140,000
Statusactive
Category (CPV) 71621000
Deadline21 Feb 2024
Contract start25 Mar 2024
Contract end24 Mar 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-9c7a32f2-b9bb-42e7-af89-27f944c1d121

description

One challenge for the deployment of Floating Offshore Wind Turbines (FOWTs) is designing and installing anchors that are both reliable and cost-effective, whilst being capable of withstanding the dynamic loads exerted by the mooring lines.

Site investigation is a critical stage in the design of these anchors. It gives vital data on seabed geology, soil properties, and environmental conditions, all of which influence the choice of anchor type, its performance, and the installation method.

The site investigation for offshore anchors typically encompasses a mix of geophysical and geotechnical surveys. The specific methods and equipment used are dictated by the characteristics of the site in question.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
24 Jan 2024 Tender (tender) · d24a5023-1378-455d-aa00-6f0309b4a357-716909
13 Feb 2024 Tender (tender) · 963270e7-9713-4bf7-80b9-4a217b83b1b4-722780

more from Offshore Renewable Energy Catapult

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.