Review of the basis of Network Rail's allocation of costs/recharges to the Scotland route
key details
| Value | £40,000 |
|---|---|
| Status | complete |
| Category (CPV) | 71311000 +1 more |
| Deadline | 30 Jan 2018 |
| Contract start | 14 Feb 2018 |
| Contract end | 12 Apr 2018 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-7d5a13bd-1c00-441a-8a27-25151f0ce5a4 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| CAMBRIDGE ECONOMIC POLICY ASSOCIATES LIMITED | £39,780 | 20 Feb 2018 | active |
description
The backdrop for this requirement is our PR18 periodic review of Network Rail which needs to take into account:
| • | Network Rail's reclassification as a public sector arm's length body; |
| • | a revised funding structure for the CP6 control period ; |
| • | our route level approach for PR18; and |
| • | the separate funding arrangements and periodic review determination that apply to Scotland. |
We wish to commission a report that sets out whether Network Rail's allocation of costs to its Scotland route (about 10% of the total) is reasonable, and consistent with best practice. The report will feed into the work of ORR's Regulatory Finance team on the financial framework for PR18. We expect to publish minded to positions on a range of financial issues in spring 2018 and our draft PR18 determination in June 2018.
The consultant will be required to produce a report that addresses the following questions:
In the context of the separate funding settlement for Scotland -
| 1. | Are Network Rail's cost allocations to Scotland reasonable and consistent with best practice for each type of cost? These costs include overheads (e.g. HR costs), central activities (e.g. timetabling) and central programme costs, e.g. digital railway. | |
| 2. | How could the Scotland route participate in any company-wide risk fund pooling or self-insurance arrangements? If Network Rail has used an approach, is the calculation of the contribution to be paid by Scotland reasonable? | |
| 3. | Are there instances where Network Rail uses a top down approach to cost allocation (e.g. allocating HR costs by number of staff) where it could instead use a bottom up approach? For example, what is the cost of providing HR services to Scotland? A further example of this issue would be the allocation of working capital balances in the NR financial model. | |
| 4. | Where relevant, how robust is NR's bottom up challenge to its top down allocations? How extensive has this been and how does this compare to best practice? | |
| 5. | Is a policy of allocating some project development costs across all routes, even where the project may not have commenced in some routes (for example trial costs associated with new technology) reasonable with respect to | the Scotland route, given its separate funding? |
| 6. | Are there any arguments for moving away from a policy under which infrastructure projects costs are always attributed to the route in which the infrastructure is built (for example Carstairs junction). Reference can be made to the question we asked on this issue in our first consultation on the financial framework and the responses received. Reference may also be made to earlier review work commissioned by ORR on this point. |
Additional information: Prospective bidders are advised to register on to the tender via ORR's eTendering Portal early as all further information regarding this tender will through the portal.Bidders should note the end dates/times for the submission of requests for clarification and proposals as set out in the ITT document.
documents
- https://www.contractsfinder.service.gov.uk/Notice/9a7a85b9-c3fc-4a3e-9f39-0ffd1bbdcfe0 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/179cbe73-6cd9-4317-9d49-6b7c6b7df21a , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/70e7bc11-f611-4ed5-a698-cf8056c7dfce , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/93de84a4-129a-47c3-890b-681ad6f86801 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/b52f13eb-27c5-406b-abaf-93a21632dff4 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/df47f70b-8ab2-4674-bdc1-1a6b03b6eae3 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 20 Feb 2018 | Award (award) | · | 779455a6-618f-4a15-b800-d133e380411c-199799 |
more from OFFICE OF RAIL AND ROAD
- Fare enforcement T&Cs focus groups and call for evidence follow-up interviews · £45,890 · 6 Mar 2025
- ORR Suite of Contracts · £27,650 · 6 Mar 2025
- Fare enforcement staff research · £87,825 · 6 Mar 2025
- Strategic Regulatory Advice · £35,000 · 6 Mar 2025
- Occupational Health & EAP · £26,979 · 6 Mar 2025
- Engineering Roles · £45,000 · 5 Mar 2025
- TDL Enhancements and Support · £146,250 · 23 Jan 2025
- Lenovo ThinkPad X13 Yoga Gen 4 x 15 · £20,264 · 16 Jan 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Structural Engineering Consultancy & Associated Services for Civic Centre 1 Piazza Refurbishment · Kirklees Council · £334,212
- Gruggies Burn Flood Alleviation scheme for Quantity Surveyor and Site Supervisor Services · West Dunbartonshire Council · £705,114
- Contract Award Notice -MEICA BiS Atkins · Department for Environment, Food & Rural Affairs · £44,000
- Contract Award Notice - THMS - AOMR - Incidence Response Contract Lot 3 · Department for Environment, Food & Rural Affairs · £350,000
- Contract Award Notice -Days Weir Refurbishment - OBC-FBC Design · Department for Environment, Food & Rural Affairs · £1,199,802
- Bromley Housing Feasibility Multi-Disciplinary · London Borough of Bromley · £200,000
- Scaling the application of low carbon concrete and FRP reinforcement - Phase 2 · National Highways Limited · £215,000
- Currynierin Community Park ICT · Derry City & Strabane District council
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.