description

***** THIS IS AN AWARD NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a competitive procurement exercise.

  1. Provide a site office and all other required facilities in accordance with Construction (Design and Management) regulations 2015 (CDM 2015)
  2. Provide a site manager to oversee the work on day-to-day basis.
  3. Provide all necessary storage solutions for all materials which will need to be sourced in advance of the work on the site without obstructing any traffic (road and pedestrian) including the hospital's supply and fire escape routes.
  4. All material necessary to execute the work should be sourced, delivered and stored on the site by no later than the 1st of October 2022. For any clarification in

terms of material/finishes please refer to the attached architect's drawing which can be found within Appendix A - Proposed Plan - Flow Facility Lab, Rooms 212,214.

  1. All work is to be executed on site within a period of 4 weeks. It is anticipated that the works on site shall commence on or around the 16th of October 2022 once all

mobilisation/off site manufacturing is complete.

  1. Provide verification of all infrastructure services before and after. You will be required to use an approved commissioning engineer by the Landlord, Imperial College (IC). It is expected that the commissioning engineer shall be required on site for 2 days and therefore bidders are to factor this into their pricing.
  2. Provide a full MEP design solution in line with the Landlord's O&M design parameters and provide final verification (commissioning to take the design into account).
  3. All work is to be done with no interruption to day-to-day operation of the LMS building.
  4. Make good all building fabric including carpets and decoration by repairing and restoring to a 'like new' standard.
  5. The successful contractor is to make their own arrangements for the disposal of all rubbish generated on the site daily, no rubbish accumulation will be allowed on the site.
  6. Clean the site once all work is completed.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
31 Aug 2022 Award (award) · 5a240450-8a27-44ec-87e6-362d967c9149-567764

more from UK SHARED BUSINESS SERVICES LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.