RDE708 Strategic Flood Risk Solutions for Lowland Peat Restoration
key details
| Value | £31,392 |
|---|---|
| Status | complete |
| Category (CPV) | 73200000 |
| Deadline | 22 Nov 2024 |
| Contract start | 29 Nov 2024 |
| Contract end | 28 Mar 2025 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-794db748-bbf3-4bae-b616-1b2466c3e932 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Jacobs UK Ltd | £31,392 | 13 Nov 2024 | active |
description
The principal aim of this project is to provide a step-by-step guide to the flood risk assessment requirements for landowners considering ecohydrological restoration of lowland peat sites, in the context of lowland peat sites with protected status in south Cumbria.
Many lowland peat sites have undergone extensive physical and hydrological modification, including:
Peat cutting with associated drainage to reduce water content of the peat.
Drainage to reduce the water table and allow the land to be used for pastoral or arable agriculture and forestry.
This, combined with a mosaic of ownership and land use history means that such sites are reduced in their natural extent, with severely compromised hydrology and an absence of peat-forming vegetation. This results in degradation of the remaining peat and a net emission of CO2.
Ecohydrological restoration of peatland sites involves disabling man-made and modified drainage using a variety of methods, to reduce hydraulic conductivity and re-instate natural flow pathways. Methods include drain-blocking and cell bunding. These restoration techniques often require permits/planning permission from different bodies, where their safety to infrastructure in the vicinity must be demonstrable.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2024 | Award (award) | · | 766a6f8e-6eda-4cbb-b907-4390a5ad7f0f-803481 |
more from Natural England
- ETAFF AENorth02 · £251,900 · 23 Jul 2026
- ETAFF AEMidlands02 · £229,000 · 23 Jul 2026
- Saltmarsh surveys of 2 SSSIs - Alde-Ore Estuary SSSI and North Norfolk Coast SSSI · £153,339 · 29 Jun 2026
- ETAFFCSFS&E10 - One-to-one Advice June 2026 to November 2026 · £72,720 · 12 Jun 2026
- North Walney Project - NEC4 PSC (Pagabo) - RIBA Stages 4-6 · £132,331 · 12 Jun 2026
- Alde-Ore Estuary SSSI and North Norfolk Coast SSSI · £153,339 · 9 Jun 2026
- ETAFF CSFNorth13 · £63,480 · 6 May 2026
- Upland Breeding Bird Surveys - South Pennine Moors SSSI · 5 May 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Provision of Value of a Life Year Research (VOLY): Lot 3 Supplementary Empirical Research · DfTc - Department for Transport · £182,737
- Provision of Value of a Life Year Research (VOLY): Lot 2 Advice on the maintenance and application of the values · DfTc - Department for Transport · £90,190
- TANL3071 - Provision of Value of a Life Year Research (VOLY): Lot 1 Primary Research · DfTc - Department for Transport · £1,298,901
- SISAC OBC WP2/4 · NCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC WP1 · NCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC 2/4 · NCCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC WP2/3 · NCC Operations Ltd T/A NCC - Innovating for Industry
- W785b - A Public Realm and Transport Framework · DERBY CITY COUNCIL · £27,479
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.