gvtcx

RSSB2593 - T995-01 - Revise and refine current locomotive gauge in GERT8073 Appendix N - Deadline Extended to July 21st

RAIL SAFETY AND STANDARDS BOARD LIMITED Published 15 May 2017 Contracts Finder

key details

Value£75,000
Statusactive
Category (CPV) 73000000
Deadline21 Jul 2017
Contract start21 Aug 2017
Contract end31 Aug 2018
Procedureopen
SME suitableYes
OCIDocds-b5fd17-6fe28265-a761-4abc-9372-ab8a9a3fc737

description

THE TENDER END DATE FOR THIS PROJECT HAS BEEN EXTENDED TO FRIDAY 21st July 5PM

This work package (WP1) is part of project T995 - Development of a new locomotive gauge, which includes two Work Packages: T995-01 Revise and refine current locomotive gauge in GERT8073 Appendix N and T995-02 External Technical Expertise.

This project T995 - Development of a new locomotive gauge has two work packages:

  • Work Package 01- Revise and refine current locomotive gauge in GERT8073 Appendix N (described in this document)
  • Work Package 02 - External Technical Expertise

This project follows on from previous projects to develop standard vehicle gauges, namely T977 - Development of a revised lower sector vehicle gauge and T978 Development of Passenger Standard Vehicle Gauges PG1 (20m) and PG2 (23m), which have already been delivered.

This research workstream supports the Vehicle/ Structure System Interface Committee's (V/S SIC's) long term Gauging strategy which aims to:

  • a)Maximise Capacity on Great Britain's Rail Network by adopting European size gauges/ vehicles over a core, nationwide network;
  • b)Define and implement standard infrastructure and vehicle gauges and provide an optimised Customer experience at the Platform Train Interface;
  • c)Lower Costs of gauging to the industry;
  • d)Contribute to Great Britain's reduction in Carbon emissions through modal shift.

This particular project (T995) looks at refining the current locomotive gauge so that it can be applied for both sides of the vehicle to infrastructure interface. The aim of the research is to have a matched loco/ infrastructure/ lower sector gauge family that will go 'nearly everywhere' with clear understanding and agreement of where a resultant compliant locomotive will not go and what the consequences/ costs/ benefits are of the resultant exception list of sites where the locomotive gauge has sub-standard clearance.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
17 Jul 2017 Tender amendment (tenderAmendment) · 5f493880-b9e2-46d1-ae85-3743126f3ae8-160371

more from RAIL SAFETY AND STANDARDS BOARD LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.