gvtcx

Gen 4 - 1 - Green Grid Green Loop Junctions: Woolmer Way - G4_1_HCC_017

Hampshire County Council Published 14 Jun 2021 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£220,011
Statuscomplete
Category (CPV) 45232130 +32 more
RegionSouth East
Deadline12 Feb 2020
Contract start22 Mar 2021
Contract end11 Jun 2021
Procedureselective
SME suitableYes
OCIDocds-b5fd17-6c373880-0d8d-441b-9c78-8493a29ce017

Award

SupplierValueDateStatus
Rocon Contractors Limited £220,011 22 Feb 2021 active

description

A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020).

Improvements to the existing C114 High Street / Woolmer Way traffic signal junction in Bordon, including upgrading of existing pedestrian crossings to toucan crossings, with a new crossing to the northern arm of the signalised junction. Works include:

Widening of selected paths to 3m wide minimum, including link to Lyndford Road
Removal of C114 southbound left turn to create a cycle path and Landscaped verge.
Remodelling of traffic islands, and crossings points
Landscaping
Drainage to suit proposed layout.
Associated signs and road markings.
Ducting and Chamber for streetlights and Traffic Signals, as well as ITS pole installation and removal.
All TM for the works.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
14 Jun 2021 Award (award) · 5d80fdf3-8882-4895-abfd-4c7d10991658-443370

more from Hampshire County Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.