gvtcx

HVLV Replacement Project

Science Museum Group Published 20 Jul 2020 Contracts Finder

key details

Value£1,200,000
Statusactive
Category (CPV) 09310000 +5 more
RegionLondon
Deadline31 Jul 2020
Contract start1 Dec 2020
Contract end1 Jun 2021
Procedureselective
SME suitableNo
OCIDocds-b5fd17-6b60e0c6-92ac-410b-a340-c58291f180f4

description

This is the first stage of a two stage tender process.

The Science Museum have identified the need to replace key components of their main electrical infrastructure supplying their South Kensington premises.

The building is supplied at Medium Voltage (MV) through a 6.6kV private network originating from two feeders originating at the neighbouring Natural History Museum site. The MV distribution supports five load centres distributed around the basement of the Science Museum. The load centres are denoted as substations H, J, K, L & M. Load centre H, J, K & M each include:

-2 No 800kVA transformers, each with close-coupled ring main units.
-2 No LV switchpanels, each fed from a dedicated transformer.

The two LV switchpanels in each load centre are linked via a busbar interconnector, which is protected by an air circuit breaker (ACB) at either end of the connection. In all load centres the transformers and LV switchgear are located in separate rooms

Load centre L utilises a single transformer/RMU and single switchpanel arrangement.

The ring main units on site are generally manufactured by Brush and are the Falcon Beta model; however there are a limited quantity of Merlin Gerin Ringmaster units installed.

The transformers were either manufactured by Brush, Peebles or Schneider.

The LV switchgear was generally manufactured by Rees Switchgear and comprises GEC switch-fuse outgoing ways and GEC M-Pact ACB incomers and bus-interconnector protective devices.

Much of the distribution equipment is life-expired, is no longer supported by the original equipment manufacturers and has been identified as requiring replacement.

This project involves the replacement of RMUs and ACBs in substations H, J, L & M. The replacement/upgrade project will be undertaken in a phased manner that causes no business disruption to the Science Museum. This will require much of the works to be undertaken outside or normal working hours, during the evenings or weekends.

The Science Museum's MV and LV maintenance is carried out by an on-site FM provider. All works will need to be undertaken in collaboration with the on-site team.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
20 Jul 2020 Tender (tender) · 98a1c0f2-866c-4db3-8da1-eee1b7a6f18c-371502

more from Science Museum Group

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.