gvtcx

Sustainably sourced biofuel to be delivered to EBRI for stationary generation

Aston University Published 18 May 2015 Contracts Finder

key details

Value£18,000
Statusactive
Category (CPV) 09100000
RegionWest Midlands
Deadline29 May 2015
Contract start1 Jun 2015
Contract end30 Jun 2015
SME suitableYes
OCIDocds-b5fd17-664b73cb-adc8-11e6-9901-0019b9f3037b

description

The EBRI micro-grid consists of a 400kW(e) generator and three Emerson ASCO 7000 switches that provide power to three buildings. The switches allow the building load to be provided with power from either the CHP engine or the national grid. The engine is a bi-fuelled modified MAN CHP engine.

EBRI requires the supplier to deliver fuel that complies with the requirements of the sustainability standards for electricity generation from biomass.

Sustainability standards can be found here: https://www.gov.uk/sustainability-standards-for-electricity-generation-from-biomass. Specifically the fuel should comply with sustainability criteria outlined for bioliquid fuels by ofgem that can be found here: https://www.ofgem.gov.uk/publications-and-updates/renewables-obligation-sustainability-criteria-bioliquids-0?docid=266&refer=Sustainability/Environment/RenewablObl/Archive

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 May 2015 Tender (tender) · ocds-b5fd17-664b73cb-adc8-11e6-9901-0019b9f3037b-64913-ebri--erdf-liquid-biofuel

more from Aston University

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.