Architectural feasibility study - Western Warehouse, Frome
key details
| Value | £65,000 |
|---|---|
| Status | active |
| Category (CPV) | 71221000 |
| Region | South West |
| Deadline | 27 Aug 2021 |
| Contract start | 10 Sept 2021 |
| Contract end | 30 Nov 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-4df6d47b-aeb5-40c8-9935-4a1abcd3e91a |
description
The brief is to undertake an architectural feasibility study and concept design work in relation to the refurbishment and re-use of the former Western Warehouse, Infill Building and former Notts Industries Offices at Saxonvale, Frome. The work will involve taking the emerging vision and the feedback from community engagement, evaluating the potential of the buildings and adjoining proposed public square to deliver on this vision and develop costed concept design options. The work is to RIBA Stage 2 (Concept Design).
The tasks will include:
- Task 1 - review and clarify the project outcomes and work programme with the client
- Task 2 - work with the Sustainability Consultant to develop an environmental audit and sustainability strategy
- Task 3 - on the completion of demolition works adjoining the Western Warehouse (expected in early September 2021) complete a further survey of the structural integrity of the buildings and the integrity of the fabric of the assets, building on earlier condition surveys to include localised opening up works to assess level of structural degradation, damp investigations, condition of the timbers, steel work, concrete and other structures and foundations, opening up works to determine exact timber sizes, floor loadings, extent and condition of drainage, water supplies and other services
- Task 4 - complete an appraisal of the potential of the buildings and adjoining public square including constraints, opportunities and project costs
- Task 5 -prepare costed concept design options for review by the client - options to include potential demolition and rebuild of some buildings as well as their refurbishment and re-use
- Task 6 - support development of business plan to consider not only construction phase but also ongoing operation of the assets
- Task 7 - contribute to the Frome Area Renewal Action Plan and Conference to be organised by the client
- Task 8 - spatial coordination and preparation of planning application (once capital funding is confirmed)
- Task 9 - technical design and construction procurement (once capital funding is confirmed)
documents
- https://www.contractsfinder.service.gov.uk/Notice/01b963fa-6865-4556-a98d-67a61c3c8a38 , tenderNotice
- https://www.mytenders.co.uk/search/show/search_view.aspx?ID=JUL162440 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 30 Jul 2021 | Tender (tender) | · | 01b963fa-6865-4556-a98d-67a61c3c8a38-456501 |
more from Frome Town Council
- Frome Town Hall - External maintenance works · £100,000 · 21 May 2026
- Frome Town Skatepark · £400,000 · 15 Oct 2025
- Henley Way ramp replacement - Frome · £48,000 · 15 Nov 2024
- Playground equipment · £150,000 · 4 May 2023
- Frome School Streets scheme · £400,000 · 14 Dec 2022
- Refurbishment of the public toilets at Victoria Park, Frome · £120,000 · 10 Aug 2022
- School Street Frome - concept & technical design · £20,000 · 28 May 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Folca 2 Phase 2 - Lead Designer Appointment · The District Council of Folkestone and Hythe · £700,000
- Invitation to Tender for the provision of architectural services for the St Ives Huers Hut: Sustainable Future and Reuse Feasibility Project. · St Ives Town Council · £12,000
- Consultancy Framework at IWM for Multi Disciplinary Services · Imperial War Museum · £99,000,000
- Westminster City Council Pipeline Development Programme - Brunel Estate - Architect · Westminster City Council · £1,741,000
- William Blake Windows and Redecorations – Design Team · The Mayor and Commonalty and Citizens of the City of London · £200,000
- ISM MM Conservation Architect for the Early Works (PBIF) and Enabling Works (MHCLG) · National Museums Liverpool · £271,043
- Voluntary Ex Ante Transparency Notice · Clyde Gateway URC · £231,440
- COV - Pearl Hyde Expansion - AWARD · Coventry City Council (COV)
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.