Safe and Warm Upgrade Scheme at Hides Green and Hill Top Bolsover - AWARD
key details
| Status | complete |
|---|---|
| Category (CPV) | 45453100 |
| Deadline | 15 Oct 2018 |
| Contract start | 19 Nov 2018 |
| Contract end | 29 Apr 2019 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-370139c7-3fea-4e8c-b0b2-5055f7dbb2a6 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Matthews and Tannert Ltd | £426,638 | 20 Nov 2018 | active |
description
Bolsover District Council wishes to appoint a principal contractor on the basis of a minor works JCT contract for the undertaking of Safe & Warm upgrade works at the 8No blocks of flats and 6No bungalows located at Hides Green and Hill Top in Bolsover.
Each block contains two ground floor and two first floor flats, the latter having their own private stairwell access. There are 32no flats in total across the site.
The main scope of this scheme is to provide central heating upgrading, kitchen upgrades, wet room conversion and improved fire safety measures within each of the flats.
Currently, heating and hot water is supplied to each flat on a communal system provided from a central boiler house, located on the site. Due to the age and general condition of the boiler it is proposed for each flat to have its own independently controlled heating system installed in the form of a gas combi-boiler. The appointed contractor will be charged with the isolation and capping-off of the existing heating system at each flat within the programme of works.
Please note that the de-commissioning of the boiler house will not form part of this project and is to be undertaken by the authority's facilities management contractor.
Existing Kitchens will be upgraded, replacing units and worktops and improving electrical provision only.
Existing shower areas are to be altered and a full wetroom conversion is to be undertaken to a standard design across all flats. This will involve the installation of a new shower, wash hand basin and w/c complete to improve and standardise the facility for all flats.
To improve the fire safety aspects of the dwelling the installation of a new multi-sensor alarm system is to be installed and fire-stopping implemented throughout as per the requested fire compartmentation survey which the appointed contractor is to arrange and oversee as part of the project.
It is estimated that a start on site is achievable for early December 2018 and that completion of the scheme should be achieved within a 20 week programme.
The tenant needs and requirements are paramount to the successful completion of this project. The successful contractor will be expected to show flexibility, excellence in tenant support / liaison and work in partnership with the Contract Administrator / Building Surveyor to meet and exceed tenant expectation and levels of satisfaction.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 21 Jun 2019 | Award (award) | · | 49e813e3-60fb-4bcf-9dea-efc085d3e50f-296633 |
more from Bolsover District Council
- Health and Safety Training - AWARD · 5 Dec 2025
- Tthe provision of a Property Security Contract - AWARD · 15 Oct 2025
- Positive Input Ventilation System - AWARD · 15 Oct 2025
- Flat Roofing Repairs and Replacement - AWARD · 6 Aug 2025
- Play Area Development - Bourne Place Play Area, Denby - AWARD · 4 Aug 2025
- Provision of Architects for RIBA Stages 0-3 for a New Build Community Centre and RICS Quantity Surveyors · £30,000 · 24 Jul 2025
- Playing Pitch Strategy and Assessment · 18 Jul 2025
- Go! Active Pool Plant Servicing - AWARD · 18 Jun 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PAHT - CSSD Wash Area Additional Works · The Princess Alexandra Hospital NHS Trust · £40,000
- Fit-Out Contractor for Charles Carter Building - AWARD · Lancaster University · £0
- Aseptic Suite & Dispensary Works - Architect & Principal Designer (Stage 0-3) · The Christie NHS Foundation Trust · £43,951
- Middlewich Police Station Refurbishment - CPA/SPU/2849P · Police & Crime Commissioner for Cheshire/Cheshire Constabulary · £72,545
- Bathroom refurb works · UNIVERSITY OF THE WEST OF ENGLAND · £20,979
- Ward 10 Refurbishment - Architect & Principal Designer · The Christie NHS Foundation Trust · £56,400
- PS-26-95 - Refurbishment of the Galleon Leisure Centre · East Ayrshire Council · £399,805
- Refurbishment and Improvements works at Adams Building · Nottingham College
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.