United Kingdom-Glasgow: Designs

Ministry of Defence, DIO Published 9 Feb 2015 Contracts Finder

key details

Value£20,000,000
Statuscancelled
Category (CPV) 38434510
RegionScotland
Deadline10 Feb 2015
Contract start10 Oct 2015
Contract end10 Jul 2017
Procedureopen
SME suitableNo
OCIDocds-b5fd17-3039c026-adc8-11e6-9901-0019b9f3037b

description

'Designs. Marine construction works. Ferry terminal building construction work. To undertake all design and build tasks associated with upgrade and refurbishment of the Mare Harbour Ro-Ro Facility for continued use by the Falklands Island Re-Supply Ships (FIRS) Point Class vessels detailed below: To provide Mare Harbour Falkland Islands with a RO-RO facility suitable to cater for berthing, mooring and offloading of the FIRS Point Class vessels; To provide Mare Harbour Falkland Islands with a facility that is capable of supporting Small Boat Operations. In order to meet these Requirements, the Works to be executed under this Contract shall include, but not be limited to, the design, construction, installation, testing, commissioning and remedying of defects of the following items: Works including, amongst other requirements: Provision of a quay structure to act as a berthing face for the safe berthing of the FIRS Point Class RO-RO vessels; Provision of supporting quay structures for mooring points to enable safe mooring; Provision of pedestrian access gangways between the existing T-head jetty, the mooring points and the berthing face; Provision of Fendering and mooring equipment, and safety equipment; Minor repair to the quay face at the stern ramp for the RO-RO; Cathodic protection to all existing sheet piled structures (including the T-head jetty), where these are retained for use in the facility; Provision of a new small boats jetty comprising a pontoon on piled moorings and a linkspan, to support small boat operations; Associated M&E services; Demolition and disposal of existing structures where these are not re-used. The design must consider the significant logistical and environmental constraints which are present at operational ports. The requirement is for a 25 year design life for all elements of this project. All designs are to comply with relevant EU, UK and FI legislation.'

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
9 Feb 2015 Tender cancelled (tenderCancellation) · ocds-b5fd17-3039c026-adc8-11e6-9901-0019b9f3037b-59890-2015-s-10-12176

more from Ministry of Defence, DIO

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.