Heat From Mines, Detailed Desktop Studies in the West of England
key details
| Value | £100,000 |
|---|---|
| Status | complete |
| Category (CPV) | 79314000 +1 more |
| Region | South West |
| Deadline | 6 Mar 2025 |
| Contract start | 7 Apr 2025 |
| Contract end | 26 Sept 2025 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-192218b9-f7e2-456c-bbf2-5bd53e07b0c6 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| TownRock Energy | £91,600 | 3 Apr 2025 | active |
description
With circa 100,000 homes above or near to former mines in the West of England, the potential for heat from mines needs investigation. The principle for investing £1.66m of Green Recovery Fund (part of the MCA Investment Fund) was agreed at Committee in March 2023. Heat From Mines is an investigatory project funded by the MCA in partnership with SGC to scope out potential for an operational mine water heating scheme(s) in the region.
We are looking for providers to conduct five detailed desktop studies concurrently from February to June 2025. These will be in the West of England Combined Authority Area which includes Bristol City Council, South Gloucestershire Council and Bath & North East Somerset Council . The specific locations that the detailed desktop studies will be required to focus on will be determined by the project working group in January 2025 and specified in the full procurement phase from mid/late January 2025. Decisions will have been made by consideration of the output reports from two current phases of studies commenced between September to December 2024 and from an earlier detailed desktop study of South Gloucestershire from 2023.
The detailed desktop studies will build upon knowledge and reports from previous study phases to produce output reports. The detailed desk top study output reports will need to provide us with detailed understanding of mines studied, water quality, structural and environmental constraints, potential drilling targets, costs of potential drilling abstraction and reinjection boreholes, all associated risks and to help us determine whether and where follow-on potential drill testing stages can take place. The studies must consider both heating and cooling potential and identify whether inter seasonal storage is possible. We also require an evaluation of the economic and social benefits and constraints from potential mine water schemes.
documents
- https://www.contractsfinder.service.gov.uk/Notice/4e50e40e-7b4b-4436-8a33-53aca1a9aabb , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/76fa05c8-480c-4093-9539-7943734fdc74 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Feb 2025 | Tender (tender) | · | 76fa05c8-480c-4093-9539-7943734fdc74-826644 |
| 29 Apr 2025 | Award (award) | · | d2f85e3a-69fd-4c3b-bdfa-5c7c3b5688cd-842799 |
more from West of England Combined Authority
- Future of Work · £75,000 · 20 Apr 2026
- Funding Assurance Reviews for the Adult Skills Fund · £90,000 · 20 Apr 2026
- Skills Connect - Video Series to support Youth Guarantee engagement and Green Skills · £35,000 · 23 Mar 2026
- Underground Assets Data Transformation & Commercialisation · 17 Mar 2026
- Construction Skills Assessment · £50,000 · 19 Feb 2026
- Metrobus Year Five Evaluation Report · £50,000 · 19 Feb 2026
- Mobile Connectivity Data and S106 & CIL Funding Assessment for Digital Infrastructure · £50,000 · 19 Jan 2026
- Sector Development Framework Benchmarking · £20,000 · 31 Jul 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- External Consultant to produce a Retail and Leisure Study for North Lincolnshire · North Lincolnshire Council
- North Islay Active Travel Route: Business Case, Feasibility & Concept Design · Argyll and Bute Council · £118,106
- Q1485 - Regional Complex Needs Project · Bridgend County Borough Council · £34,999
- Feasibility study into applying a One Health approach to address air pollution issues within and around Protected Site Strategy areas. · Natural England · £37,500
- Kirkcaldy District Heating Feasibility Study · Fife Council · £72,177
- New Crematorium Feasibility Study · Sheffield City Council · £15,000
- Leeds Station Onward Travel feasibility Study - proposed approach to commissioning and appointment of consultants · Leeds City Council
- Heat Network Support Unit: Detailed Feasibility for Expansion of Forthside DHN · Stirling Council · £49,984
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.