gvtcx

Design and build geothermal infrastructure for the UK Geoenergy Observatory at Cuningar Loop, Glasgow, UK

UK Research & Innovation Published 2 Jun 2021 Contracts Finder

key details

Value£310,000
Statusunsuccessful
Category (CPV) 45000000 +8 more
RegionScotland
Deadline21 Apr 2021
Procedureopen
OCIDocds-h6vhtk-029c9d

Award

SupplierValueDateStatus
not named · · unsuccessful

description

Short description: The British Geological Survey (BGS) and the Natural Environment Research Council (NERC) are constructing a mine water geothermal research facility on the Cuningar Loop in east Glasgow as part of the UK Geoenergy Observatories project (from now on referred to as the ‘Glasgow Observatory’). Both NERC and BGS form a part of the UK Research and Innovation (UKRI).

The tender is for the procurement of a supplier to provide the design and build support to BGS (the Client) in delivery of the geothermal infrastructure for the Glasgow Observatory.

The Contractor’s main responsibilities will include but are not limited to: detailed design and construction of the works; testing and commissioning the works.

The supplier shall be appointed under an NEC4 ECC

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

4 notices published against this procurement.

PublishedTypeRegimeNotice
17 Mar 2021 Contract notice (F02) Earlier regulations 005420-2021
17 Mar 2021 Tender (tender) · b086230a-8246-4a7f-8a52-40879473d083-420779
2 Jun 2021 Contract award notice (F03) Earlier regulations 012281-2021
2 Jun 2021 Tender (tender) · e55d9642-2bb9-4342-8b24-cf9ccac2cdef-440596

more from UK Research & Innovation

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.