M6 Lune Gorge Structures - Monitoring Services
key details
| Value | £250,000 |
|---|---|
| Status | active |
| Category (CPV) | 44212100 +1 more |
| Deadline | 4 May 2026 |
| Contract start | 1 Jun 2026 |
| Contract end | 1 Jun 2030 |
| Procedure | limited |
| SME suitable | Yes |
| OCID | ocds-b5fd17-1a4370e3-96c5-404a-bb7c-7b0031e5c5a8 |
description
The M6 Lune Gorge Structures Scheme requires Structural Monitoring across 6nr bridges, as well as CR monitoring to temporary piling on the scheme.
The package will be split into 3 parts; Monitoring of the existing bridge substructures during demolition and replacement deck installation, monitoring of new construction considering settlement / tilt and vibration monitoring through construction and into post construction, and central reserve temporary embedded retaining walls works associated with piling / retaining wall construction.
Tenderers will be required to propose an efficient manual / automated monitoring methodology meeting the stated frequencies, data capture, and reporting aligned with trigger and mitigation actions.
Considerations around access and sequencing will be discussed.
The package includes, but is not limited to: control points, baselining, routine monitoring (Ranging from daily to weekly), and maintenance.
documents
- https://www.contractsfinder.service.gov.uk/Notice/4af85977-b6d6-4145-a99d-f604ef001451 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 21 Apr 2026 | Tender (tender) | · | 4af85977-b6d6-4145-a99d-f604ef001451-893559 |
more from KIER TRANSPORTATION LIMITED
- A66 Northern Trans-Pennine Project (NTP) - Schemes 1 & 2 Vehicle Restraint System / Barriers · £450,000 · 23 Jul 2026
- M6 Lune Gorge - Bored Piling Works · £400,000 · 23 Jul 2026
- A66 Northern Trans-Pennine Project (NTP) - Schemes 1, 2 and 6 Drainage Materials Provider · £80,000 · 1 Jul 2026
- M6 Lune Gorge - Roundthwaite Box - Civils Package · £50,000 · 25 Jun 2026
- M6 Lune Gorge - Roundthwaite Box - Fibre Reinforced Concrete Package · £50,000 · 25 Jun 2026
- M6 Lune Gorge - Roundthwaite Box - Steelwork Package · £50,000 · 25 Jun 2026
- M6 Lune Gorge - Roundthwaite Box - Piling Package · £50,000 · 25 Jun 2026
- M6 Lune Gorge - Pier Bracing and Clamp System · £1,000,000 · 10 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Street Skate Park Pedestrian Footbridge · Street Parish Council
- Services related to the strengthening and maintenance works relating to Millennium bridge, Hull, Direct award Lot 1a · Hull City Council · £69,373
- Culvert bridge replacement, Sandall Beat · City of Doncaster Council
- Stainforth Town Deal - Station Gateway projects. · City of Doncaster Council
- SO1099 Newtown Riverbridge Bearing and Expansion Joint Replacement · Caerphilly County Borough Council
- ECS006/2024 NEPO 211 - LOT 1 - Tees Valley up to £750k - A174 Marton Interchange Bridge Mini Tender For a Design and Build Contract · Middlesbrough Borough Council · £933,793
- Replacement of Cockshaw Bridleway Bridge · City of Doncaster Council
- Principal Inspections and Related Services for 5No.Structures, Direct Award Lot 1a · Hull City Council · £135,818
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.