Supply, Installation and Commissioning of replacement heating system for Torridge Pool
key details
| Value | £275,000 |
|---|---|
| Status | active |
| Category (CPV) | 71000000 +1 more |
| Region | South West |
| Deadline | 8 Dec 2017 |
| Contract start | 26 Feb 2018 |
| Contract end | 30 Mar 2018 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-15665b52-9d77-47b2-967d-bc8de7b3cb4d |
description
The existing 12 (no.) 50 kW Concord mains gas boilers are nearing end of their useful life and require replacing. The overall aim is to provide a return on the Authority's investment, improve efficiency, remove end of life equipment and plant, improve controls, reduce duplication, reduce maintenance costs and requirements . The current 600 kW boiler capacity is subject to review by the contractor to ensure that the maximum demand from the facility can be met by any replacement system. The 600 kW is based on the current boiler sizes on site but may not represent an appropriate size and a smaller system is acceptable if it meets peak demand requirements. This should be clearly identified in any documents. The client is not predetermining the new heating system type or its supplier and this is entirely to the contractors' design subject to evidence that the proposal is adequate to meet the heat demand.
documents
- https://www.contractsfinder.service.gov.uk/Notice/37525e7c-5dc6-4370-97d7-8f3ce5183daa , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Nov 2017 | Tender (tender) | · | 37525e7c-5dc6-4370-97d7-8f3ce5183daa-181905 |
more from Torridge District Council
- PPE & Corporate Workwear · £36,000 · 24 Apr 2025
- Managed Business Continuity Disaster Recovery · £45,326 · 14 Mar 2025
- Replacement of Pay & Display Machines · £166,000 · 14 Mar 2025
- Torrington Pannier Market Hall Refurbishment · £48,000 · 6 Mar 2025
- Bideford Regeneration Business Case Development Commission · £50,000 · 13 Jan 2025
- Operational Services Centre Construction, Bideford · £4,400,000 · 4 Oct 2024
- Section 278 Works for Operational Services, Centre, Bideford · £200,000 · 16 Sept 2024
- North Devon & Torridge Green Hydrogen Routemap · £70,000 · 15 Aug 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ENQ1319c - Highways Concept Design · DERBY CITY COUNCIL · £29,853
- ENQ1319a - Darley Abbey Mills Bridge - New Bridge Scoping Commission · DERBY CITY COUNCIL · £29,958
- ENQ1329 - Darley Abbey Mills Bridge - specialist transport planning consultancy support · DERBY CITY COUNCIL · £95,320
- PAHT - NHP Stage 1 MEP Services · West Hertfordshire Teaching Hospitals NHS Trust · £110,000
- PAHT - NHP Traffic and Transport Specialists · West Hertfordshire Teaching Hospitals NHS Trust · £55,000
- PAHT - NHP Civil & Structural Engineers · West Hertfordshire Teaching Hospitals NHS Trust · £75,000
- PAHT - NHP Architect Services · West Hertfordshire Teaching Hospitals NHS Trust · £240,000
- Project Manager and Design Team - CR4 Supercomputer Preparation Project · University Of Edinburgh · £472,910
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.