gvtcx

Supply and manipulation of Boiler Tubes

LondonWaste Published 28 May 2017 Contracts Finder

key details

Statusactive
Category (CPV) 44163000
RegionLondon
Deadline29 Jun 2017
Contract start1 Jul 2017
Contract end31 May 2020
Procedureopen
SME suitableNo
OCIDocds-b5fd17-128f46dd-4035-4dfb-9e7d-c79f00e03ebd

description

The supply of Complete Boiler Elements or individual tubes to the design of the boiler components currently installed. The bending of tube shall be in accordance with the requirements of BS EN 12952 and controlled to minimise distortion and/or thinning of the tube on the bend radius.

All materials shall be manufactured and tested in accordance with PED 97/23/EC and BS EN 10216-2:2003 (seamless steel tubes for pressure purposes). All tube is seamless cold drawn precisions steel, manufactured and tested in accordance with BS 3059.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
28 May 2017 Tender (tender) · 20d4fd52-2372-4e01-88e5-c3ce567b51db-150334

more from LondonWaste

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.