Refurbishment Constantine Second Floor Corridors
key details
| Value | £1 |
|---|---|
| Status | complete |
| Category (CPV) | 45453000 |
| Region | North East |
| Deadline | 30 May 2017 |
| Contract start | 19 Jun 2017 |
| Contract end | 27 Aug 2017 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-0550e7f7-dfe1-40f2-affd-be47cfacdb9b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Ashbrook construction | £0 | 6 Jul 2017 | active |
description
The project consists of the full refurbishment of three corridors on the second floor Constantine to include replacement of suspended ceilings and lighting, new flooring, removal of lockers, new plasterwork to walls etc. as indicated in attached drawings. The duration of work is anticipated to be 8 weeks. The areas affected are:
- Second floor corridor
Closing Date for this Tender is 14.30 on Tuesday 30th May 17
Tender Documents can be found using the link below, you will need to register as a supplier
https://in-tendhost.co.uk/teessideuniversity/aspx/Home
documents
- https://www.contractsfinder.service.gov.uk/Notice/9d3222a0-32ac-4b48-a64c-84aac565ca27 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Nov 2017 | Award (award) | · | 151db499-dbd1-4915-8ecb-c7640e391da2-182581 |
more from Teesside University
- NZIIC Gas Chromatograph with FIDTCD Detectors · £29,610 · 11 Jul 2023
- Cisco Wireless Access Points - Wifi6 · £215,721 · 5 Oct 2022
- Net Zero Industry Innovation Centre (NZIIC) Build Construction · £8,620,448 · 15 Feb 2022
- ERDF - Leadership Forge Residential · £19,454 · 14 Dec 2021
- ERDF - AV Equipment for ITDC Lab · £26,208 · 16 Sept 2021
- Net Zero Project Cost Consultants RIBA Stages 4-7 · £76,250 · 14 Jun 2021
- Project and Cost Consultants for Net Zero · £22,480 · 5 Jan 2021
- ERDF - Architectural Led Design Team for Net Zero · £102,203 · 5 Jan 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- SYP - Pioneer Close Phase 2 refurbishment · South Yorkshire Mayoral Combined Authority
- Minor Works Framework · Gentoo Group · £19,620,611
- Planned Programme Works · Albyn Housing Society Limited
- Ceiling Mounted Utilisation Sensors · South London and Maudsley NHS Foundation Trust · £240,000
- SYP - Rotherham Main Street Refurbishment · South Yorkshire Mayoral Combined Authority
- CA16715 - C0 Toilet Refurbishment for Northampton College · Crescent Purchasing Consortium Consultancy Ltd
- Academy - Phase 2 Structural Works · The City of Liverpool College · £350,000
- Refurbishment - Electrical Workshops · The City of Liverpool College · £400,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.