gvtcx

T/KJ193/22 WP16/RACE Divertor Coil Removal

United Kingdom Atomic Energy Authority Published 21 Oct 2022 Contracts Finder

key details

Statusactive
Category (CPV) 38400000 +14 more
Deadline21 Nov 2022
Contract start12 Dec 2022
Contract end27 Jan 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-051fe72d-cbb0-497a-9c83-368cb429f4dd

description

United Kingdom Atomic Energy Authority (UKAEA) - the Client - is developing technologies for nuclear decommissioning in both fusion and fission fields. UKAEA is proving feasibility of different cutting tools for size reduction of different components. Those technologies will eventually be deployed fully remotely in the final application. Currently undertaken study focuses on cutting of a complex, nonradioactive component. The workpiece to be cut is made of multiple copper coils encased in resin, cladded with Inconel and with stainless steel heat shields attached. The two technologies investigated are the diamond wire saw (DWS) cutting and circular saw (CS) cutting. Both have been previously deployed to cut the work piece, but further development of those technologies is needed. The focus of the proposed trials is to investigate cold and dry cutting and perform reaction force and temperature measurement.

Therefore, UKAEA is looking at contracting a cutting technology specialist to demonstrate cutting of the work piece using both technologies in accordance with the specification.

The Client is particularly interested in learning about blade types, forces and temperatures observed during Circular Saw cutting. The justification for performing CS trials is based on expert recommendation of CS technology and to understand the feasibility of the technology based on prior CS trials. There are CS technology concerns that the Client is interested to understand, particularly Blade type, required sample clamping forces, required cutting forces, recommended cutting speed and rate. Likelihood of CS snagging / stopping abruptly and with high stopping loads (what is the maximum torque), amount and type of swarf / material generated when compared to a DWS, sample temperatures reached during cutting and the effect on the Epoxy Resin within the Divertor Coils, heat generation of smoke, harmful and damaging halogen gases which could damage extract gas handling systems.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 Oct 2022 Tender (tender) · 232566bb-dae7-4209-823b-b0764b4aa7d2-583097

more from United Kingdom Atomic Energy Authority

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.