Provision of Support on Civil Engineering Safety Assessment for Step 3 of the UK ABWR
key details
| Value | £379,735 |
|---|---|
| Status | complete |
| Category (CPV) | 73000000 |
| Deadline | 16 Jul 2015 |
| Contract start | 17 Jul 2015 |
| Contract end | 28 Feb 2016 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-01c2ddf9-adc9-11e6-9901-0019b9f3037b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| OVE ARUP & PARTNERS LTD | £379,735 | 16 Jul 2015 | active |
description
STATEMENT OF SERVICE REQUIREMENT FOR THE PROVISION OF SUPPORT ON CIVIL ENGINEERING SAFETY ASSESSMENT FOR STEP 3 OF GDA OF THE UK ABWR
BACKGROUND TO THE PROJECT
| 1) | In January 2014 ONR formally started Step 2 of the Generic Design Assessment (GDA) of Hitachi General Electric’s (Hitachi-GE) UK Advanced Boiling Water Reactor (UK ABWR). Hitachi-GE is the Requesting Party for the UK ABWR GDA (referred to as “the RP” in this specification). |
| 2) | Step 2 of GDA is an overview of the acceptability, in accordance with the regulatory regime of Great Britain, of the design fundamentals, including review of key nuclear safety and nuclear security claims with the aim of identifying any fundamental safety or security shortfalls that could prevent the issue of a Design Acceptance Confirmation (DAC) (see http://www.onr.org.uk/new-reactors/ngn03.pdf for details). |
| 3) | During Step 2, ONR has reviewed the key safety claims put forward by RP in the area of Civil Engineering Preliminary Safety Report (PSR). ONR completed Step 2 at the end of August 2014. ONR’s technical assessment reports covering the assessment work undertaken during Step 2 and key conclusions were also published in August 2014. |
| 4) | During Step 3, ONR will assess the “safety arguments” of the Civil Engineering safety case submissions which support the safety claims made. |
| 5) | For Civil Engineering “safety argument” is interpreted as the structured robust justification to underpin the claims made by the RP (see also scope of the services required). The safety arguments should be coherent, sufficient and commensurate with the potential risks. They should provide the entry points and clear links to the safety case documentation as a whole. |
| 6) | ONR’s Step 3 assessment plan in the area of Civil Engineering acknowledged that the key claims on Civil Engineering by the RP during Step 2 were incomplete. As a result, ONR’s Step 3 assessment will also consider whether the key claims relating to Civil Engineering that underpin the safety of the UK ABWR are complete and reasonable. |
| 7) | For Civil Engineering “safety claim” is interpreted as being: |
| | Specific and measurable statements that show that Civil Engineering aspects of the UK ABWR meet the relevant Safety Assessment Principles 2014. |
| | A clearly documented basis of design for each structure – to include classification, safety functional requirements, operational requirements, structural form, load paths, loads and combinations, materials and construction/decommissioning sequence. It should be noted that: |
| • | Safety claims and supporting documentation must have a clear structure and hierarchy so that the design basis is set out logically. |
| • | The UK context should be fully recognised and addressed |
| • | Internationally recognised standards and relevant good practice should be adopted |
| • | The codes and standards used for each structure should link to the classification of that structure. Internationally used nuclear codes present less of a challenge than |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Nov 2015 | Award (award) | · | ocds-b5fd17-01c2ddf9-adc9-11e6-9901-0019b9f3037b-79930-onr261 |
more from DEPARTMENT FOR WORK AND PENSIONS
- Microsoft Unified Support · £5,520,000 · 30 Apr 2026
- Digital Forensics Professional Services · £624,999 · 30 Apr 2026
- Test1 · £12,000 · 24 Mar 2026
- Lease Regear Management Services · £85,000 · 29 Oct 2025
- PIP/CMS Oracle Cloud Infrastructure (OCI) · £399,000 · 27 Oct 2025
- Digital Enablement and Engineering Programme (DEEP) Overall Programme Workstream Delivery · £6,000,000 · 27 Oct 2025
- Hybrid Cloud Engineering Operations Services · £3,000,000 · 6 Oct 2025
- User Research Participant Recruitment for DWP Digital · 16 Sept 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ACAS27482 - MH Good Practice tender · UK SHARED BUSINESS SERVICES LIMITED · £69,730
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Award of Effective ventilation guidance and practice to mitigate the indoor airborne transmission... · Scottish Government · £9,826
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.