London Plan Review Project No.3 – Characterisation of London’s Historic Environment – State of Conservation
key details
| Value | £30,000 |
|---|---|
| Status | active |
| Category (CPV) | 92522000 +1 more |
| Region | West Midlands |
| Deadline | 7 Dec 2015 |
| Contract start | 14 Dec 2015 |
| Contract end | 20 Feb 2016 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-0047cf80-adc9-11e6-9901-0019b9f3037b |
description
Project Brief No.3: London Plan Review
Characterisation of London’s Historic Environment – State of Conservation
- Project Summary
This project will examine the contribution of reports commissioned by London’s boroughs characterising their historic environment. Much of this work has been carried out since the last London Plan Review. Understanding this contribution and the significance of London’s historic environment will be an important part of the evidence base as the next London Plan is developed. It is also an essential framework for local planning and management of the historic environment. This assessment is the principal element of the research project.
In addition to providing an overview of borough-level characterisation, the project will report on the coverage of conservation area appraisals and management plans, local guidance on archaeology and heritage asset monitoring, as part of state of conservation reporting and management.
- Background
The London Plan (legally called a Spatial Development Strategy) is currently the only regional plan in England, and provides the strategic planning framework for the future development of London over a 20 year period. The London Plan includes approximately 120 policies including a suite which influence the management of the historic environment.
Further Alterations to the London Plan (FALP) were undertaken in 2014, with a revised Plan being adopted in March 2015. Following the publication of the FALP, the Mayor instructed a full review to take place. However a delay to this review will be caused by the Mayoral elections in May 2016. So the first stage of formal consultation is expected to take place in Spring 2017 which will provide an early indication of the direction of travel of the review. A full version of the revised Plan for consultation is expected in Autumn 2017.
The inspector’s report on the FALP raised a number of questions about the capacity of London to accommodate all its growth within its existing built confines without placing unacceptable pressures on the city’s communities and environment. ‘The impact on increasing densities on townscapes [including the historic environment]… needs to be considered’ as well accessibility levels. The report notes that ‘town centres are accessible locations but each has its own character which new development should respect’ and large sites should have regard to their surroundings. ‘Meeting the pressing need for housing in London will require new, possibly innovative solutions but care must be taken not to damage its environment such that it becomes an unpleasant place to visit, live and work’. Paragraphs 41, 42, 54 and 55 of the report are particularly relevant as context to this project.
Recently Historic England responded to the Outer London Commission consultations on issues relating to options for growth, barriers to delivery and regional governance. The options for growth...
Additional information: Please see attached documentation
Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/historic-england/aspx/Home
documents
- https://in-tendhost.co.uk/historic-england/aspx/Home , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/f3e49e71-c0fd-4693-9ed5-6ed5580b76ac , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 13 Nov 2015 | Tender (tender) | · | ocds-b5fd17-0047cf80-adc9-11e6-9901-0019b9f3037b-79747-p-ref-00000237 |
more from Historic England-Heritage Protection & Planning: National Planning & Conservation
- STAGE 1 IMMEDIATE REPAIRS AT SNODHILL CASTLE HEREFORDSHIRE - AWARD · £100,000 · 18 Nov 2016
- Public Relations and Marketing for Stage I at Shrewsbury Flaxmill Maltings - AWARD · £25,000 · 18 Nov 2016
- London Plan Review Project No.4 – Local Character and Density · £30,000 · 13 Nov 2015
- London Plan Review Project No.2 – Evaluation of Heritage Policies · £30,000 · 13 Nov 2015
- London Plan Review - Project Brief No.1- London Borough Development Plan · £2,000 · 13 Nov 2015
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- City of London Public Statuary Cleaning and Repairs 2026 · The Mayor and Commonalty and Citizens of the City of London · £375,000
- Lead Consultant - Finzean Mills · Finzean Bucket Mill CIC · £2,500
- Fort Cumberland Conservation Management Plan - NP328 · Historic England · £40,000
- Fort Cumberland Conservation Management Plan - NP328 - AWARD · Historic England
- GB-Duxford: AWARD NOTICE ~ Refurbishment of Building 4 at IWM Duxford · Imperial War Museums · £659,150
- Pendle Textile Mills Design Code - AWARD · Historic England · £45,000
- Torre Abbey Restoration Project · Torbay Council · £1,200,000
- EBEH Heritage minor works · BIP SOLUTIONS LIMITED
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.