gvtcx

Flood Re - Independent Model Validation Delivery

Flood Re Published 8 Sept 2016 Contracts Finder

key details

Statusactive
Category (CPV) 66519310
RegionLondon
Deadline3 Oct 2016
Contract start1 Nov 2016
Contract end30 Sept 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-270381be-adca-11e6-9901-0019b9f3037b

description

Flood Re is applying to the PRA to use a partial internal model (PIM) to set regulatory capital under Solvency II. Flood Re is exposed to risk from a single peril (flood) within a single territory (UK). The planned scope for the PIM is as follows. Insurance risk (premium, reserve and catastrophe risk), forward looking credit risk (in relation to expected RI recoveries) and operational risk will each be calculated using the Flood Re internal model. Market risk and credit risk relating to on balance sheet recoverables and cash at bank will be assessed using the Standard Formula. The components of the standard formula and internal model will be drawn together using the default "integration method" (the Standard Formula correlation matrices). Flood Re is looking to appoint an external partner (the "main validation partner") to provide independent PIM validation services covering a multi-year validation cycle (3 years), supporting the Risk Function with second line validation and reporting to Flood Re's Chief Risk Officer and the IMAP Steering Committee. The first phase of the validation will run from Q4 2016 to September 2017 at which point Flood Re will submit its full IMAP Application. The following two years of validation will take on a "steady-state" validation approach where by modules of the Partial Internal Model are validated in line with a defined cycle (based on materiality and shifts in Flood Re's risk profile). For the first phase of validation (up to September 2017), the main validation partner will leverage two other aspects of Model Validation and will need to liaise with the suppliers providing each: 1) Model Scope Validation - Validate the scope of the partial internal model to ensure it appropriately covers all Flood Re's material, quantifiable risks 2) UK Flood Modelling Validation - Validation of the flood risk modelling components of the Partial Internal Model The main validation partner will therefore need to draw the key themes and findings from each of the above deliverables and incorporate them into an overarching validation report, alongside completing independent validation of the areas of the model not covered by the above activity (e.g. Non-flood model components, Model Use, Governance, Documentation etc).

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender (tender) · f977218d-2eb6-493a-a202-9e9bf1e5b7d7-108623

more from Flood Re

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.