RA354019 - LondonEnergy EcoPark Roof Repairs

LondonEnergy Ltd Published 14 Oct 2025 Contracts Finder

key details

Statusactive
Category (CPV) 45000000
Deadline7 Nov 2025
Contract start8 Nov 2025
Contract end5 Dec 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-263cd638-7f73-456f-906a-a52e0bf6ad69

description

London Energy require works to 4 area of the Boiler house Roof

Please see below description of works. The full spec including photos is available on MultiQuote.

Please email lewis.atkinson@londonenergyltd.com for full scope and photos if you are unable to access via MultiQuote.

  • Required works:
  • 1.Visual and physical barriers to 2no ~8x6m sections of roof

Three sunken areas of roof have been patched and waterproofed from above. We now need visual and physical barriers to these areas to stop anyone walking from above. Two ~8x6m areas to be barriered off

Requirement:

  • Paint: Hazard striped paint (yellow and black diagonal lines) to 8x6m area of roof
  • Barriers: Chain barriers around perimeter, 2 rows, suitable for high winds.
  • Signage: "Danger, Keep out, fragile roof" signage, or similar
  1. Steel re-enforcement to underside of 1 off 4x4m section of steel decking

One sunken area of roof has visible deterioration on the steel decking underside. Whilst no one will be walking from above, we want additional strengthening to this area, to mitigate risk of collapse from e.g. snowfall, while also keeping the ability to visually inspect from below.

Requirement:

  • Clean and paint: Clean up and fire proof painting of existing deteriorated area of underside steel decking (approx. 2x3m)
  • Brackets: Mount several brackets from either steel beam, laid between the ridges, spaced at ~200mm intervals (or alternative suggestion), taking care not to pierce the roof membrane
  1. Repair unadhered membrane to upstand.

A large area of unadhered roofing membrane is present at the upstand. We now need this to be repaired. Approx 8 x 2m area, to mitigate risk of water ingress and damage to roof.

Requirement:

  • Repair: Remove old felt membrane and lay new
  1. Level out flood-prone area

An approx. 12x1m area is prone to flooding. We require this to be levelled out so the water flows out of the area

Requirement:

  • Works to level out the area to avoid it flooding during heavy rainfall

Schedule

Works to be completed during November 2025

RAMS

RAMS required prior to commencing any works,

Pricing

Please provide individual pricing and details of what will be provided:

  • To access this competition: login to https://suppliers.multiquote.com and view the opportunity RA354019. Not registered on MultiQuote - visit https://suppliers.multiquote.com then register and quote RA354019 as the reason for registration. Any queries please contact MultiQuote on 0151 482 9230.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
14 Oct 2025 Tender (tender) · 24c2ad4c-81bc-408b-a033-a85a51e3059a-867998

more from LondonEnergy Ltd

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.