Thames Tideway Tunnel - C405 Main Works West - Propping Steel copy
key details
| Status | active |
|---|---|
| Category (CPV) | 45262670 +1 more |
| Region | London |
| Deadline | 5 Dec 2019 |
| Contract start | 27 Dec 2019 |
| Contract end | 31 May 2020 |
| SME suitable | No |
| OCID | ocds-b5fd17-258a7970-dc70-4b72-8719-c1b4354d5988 |
description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
- a.tunnels:
- i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
- ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
- b.Worksites:
- i.five main tunnel Worksites (drive and/or reception sites)
- ii.16 CSO Worksites
- iii.two System modification Worksites Thames Tideway Tunnel
- iv.works at Beckton Sewage Treatment works.
Supply of HAMPS Connection Culvert Propping Steel
Steel frames are required to provide internal propping support to a sheet pile cofferdam whilst excavating to a depth of 16m below ground. This is for the Hammersmith Pumping Station Tideway West Project. Frames are required on 4 different levels of the cofferdam.
BMB requires that frames are made in readiness for delivery on the given programmed dates which are subject to change. An allowance should be made to store required frames until such a time where they are required by BMB. All deliveries will be made in accordance with the delivery requirements outlined in this ITT.
Programmed delivery dates:
Level 1 frame - 5th February 2020
Level 2 frame - 25th February 2020
Level 3 frame - 25th March 2020 (includes both frames B2 & A3/B3)
Level 4 frame - 15th April 2020
Supply all steelwork and associated items required for each level, to be assembled on site by others as shown on the Drawing Package - including but not limited to:
| • | Waler beams |
| • | End plates |
| • | Struts, braces and batten plates |
| • | All bolts and fixings |
The pricing submission should include the weight of each beam and an overall weight for each frame.
Delivery costs should clearly identifiable in your submission.
A site visit is strongly recommended. To arrange, please contact the following point of contact,
Jonathan Knight Tel: 07530613125
Email: Jonathan.Knight@tideway-west.london
Address: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD
Drawing Package contains the following drawing numbers:
3350-BAMNU-HAMPS-450-CZ-DR-2000015 P03
3350-BAMNU-HAMPS-450-CZ-DR-2000016 P04
3350-BAMNU-HAMPS-450-CZ-DR-2000017 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000019 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000020 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000021 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000022 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000023 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000024 P01
3350-BAMNU-HAMPS-450-CZ-DR-2000025 P01
The drawings contained with-in this ITT are subject to revision and therefore no work or manufacturing should be undertaken until instructed by BMB.
Documents, Drawings and Specifications
Drawing Package
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
HAMPS: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD
Additional information: HAMPS: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=46885737 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/c111467f-b996-40ee-b681-080271d8e713 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 20 Nov 2019 | Tender (tender) | · | c111467f-b996-40ee-b681-080271d8e713-327560 |
more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Thames Tideway Tunnel - C405 Main Works West - Carnwath Road Pit Bottom Steel Alterations · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Intertidal Terrace · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Pipe Jacking works for Syphon Main ACTST · £500,000 · 9 Apr 2021
- Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking · 12 Mar 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Security Gates & Fencing · £1 · 17 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Steel Connection Shutters · 5 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Acton) · £1 · 8 Jan 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead · £1 · 21 Oct 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- IMO Front Barrier Replacement Works 2025 · Department for Transport · £25,000
- Metal and Brick Work Community Resilience - AWARD · Thirteen Housing Group Ltd · £26,960
- GB-St. Helens: Air Source Heat Pump protection cages · Torus Group · £60,000
- Steel Work Requirements · Redcar & Cleveland Borough Council
- Metalwork repairs to gates and associated items · NEWCASTLE CITY COUNCIL
- BE24045 - Metal discs · UK SHARED BUSINESS SERVICES LIMITED · £15,485
- MTC small engineering & general metalwork for callouts, repairs and planned maintenance to all Council properties & locations · Belfast City Council
- Metalwork QQ · Newcastle City Council · £100,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.