Chapel Building: Roof Replacement Design / Façade and Flooring Options and Design
key details
| Value | £1 |
|---|---|
| Status | complete |
| Category (CPV) | 71200000 +4 more |
| Deadline | 9 Sept 2022 |
| Contract start | 12 Sept 2022 |
| Contract end | 4 Nov 2022 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-251dc125-26fe-4cbf-a1d9-acb7f51b2f19 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| BAILEY PARTNERSHIP (CONSULTANTS) LLP | £60,818 | 16 Oct 2022 | active |
description
The University of Chichester is seeking the professional services of a multidisciplinary consultant to support in investigations, assessment, and subsequent design / specification to fully replace our Chapel Building Roof. This work is required to be to a RIBA 4 level, to feed directly into business case approvals, and subsequent tender activity. The resulting specification will give sufficient detail to support full project delivery, including scope, cost plan (pre-tender estimate), and detailed design programme. The Chapel Building is a locally listed building / within a conservation area.
Constructed in 1961 the Chapel Building is steel framed with masonry and 'Crittall' glazed cladding sections. The main roof is a steeply pitched concrete pan tile cladding over a slaters felt to soft wood batten and close boarding, with four lead lined valley sections and eight lead lined internal gutter sections to the gables where the tiles and ridges are all bedded into position on a mortar base. All pitched sections discharge onto the flat roofs.
Primary Requirement - Original Roof Replacement Design (Pitched and Flat)
- Undertake necessary preliminary investigation / assessment of roof areas to enable subsequent activities and design.
- Subject to University agreement on concept design proposals, provide full specification to RIBA 4 level, to feed directly into business case approvals, and subsequent tender activity. The resulting specification will give sufficient detail to support full project delivery.
- Provision of pre-tender estimate level cost plan.
- Provision of detailed design programme.
Provide recommendations and options for upgrades that would provide increased energy efficiency and consumption, and to 'futureproof' the work, allowing for thermal modelling if required.
- Noting the above point as example, proposals will include for all required specialist disciplines, such as structural engineering, to feed into the design.
- Provide recommendations to improve life expectancy or longevity of the system to be included.
- The above will be provided in a format that can be used for subsequent business case development activity, and to enable tender activity.
Additional, and separate optional proposals, are welcomed on treatment of the glazed facades, and floor remedial work. (Please see the tender documents for full detail of these).
All contact, queries, and applications should be directed to: tenders@chi.ac.uk
Tender documents are available at: https://help.chi.ac.uk/tenders
documents
- https://help.chi.ac.uk/tenders , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/42d05461-c894-4758-b5ee-29540ffc6ac1 , contractDraft
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/52a26a9a-d677-4eb0-91b6-83538c9d57d0 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/7c302436-cf25-42b1-b330-16966b2a26d8 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/bba91bb0-a640-4c6c-b0aa-0e9fa3ea9532 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Aug 2022 | Tender (tender) | · | bba91bb0-a640-4c6c-b0aa-0e9fa3ea9532-564678 |
| 15 Jan 2024 | Award (award) | · | 56e29769-63b7-4988-a255-0ed57217dfee-713887 |
more from THE UNIVERSITY OF CHICHESTER
- Heating and Boiler Replacement · £0 · 31 Jan 2025
- Bishop Otter Campus: Measured Term Contract for student residences Courtyard Blocks "light touch" refurbishments · £300,000 · 15 Jan 2025
- Firewall Support and Maintenance · £0 · 12 Nov 2024
- Student and Curriculum Management Systems · 2 Oct 2024
- Manual Handling Training for Registered Nurse and Physiotherapy Students · £0 · 27 Jun 2024
- Door locks, and 'key' management system · £0 · 27 Jun 2024
- AV Support and Supply · £0 · 5 Jun 2024
- Specialist Student Accommodation WiFi and Internet · 13 May 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Framework for Architectural Services for Codi Group’s Residential Schemes · Codi Group Ltd · £2,000,000
- PROPOSED COMMUNITY SPORTS FACILITY AT LAURELVALE · Armagh, Banbridge & Craigavon Borough Council
- Fframwaith Ymgynghori Adeiladu / Construction Consultancy Framework · Adra (Tai) Cyf · £4,000,000
- Call off under the NHS SBS Framework SBS10190 (Lot 7) · BIRMINGHAM CITY COUNCIL · £300,000
- Broadlands Children's Home - Architectural Services · Bristol City Council · £88,571
- GLA Architecture and Urbanisation Framework 4 · Transport for London
- Architect Framework for the South West Region · Sanctuary Housing Group · £1,320,000
- North Walney Project - NEC4 PSC (Pagabo) - RIBA Stages 4-6 · Natural England · £132,331
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.