Request for Quotation (RFQ) For Midland Metro Limited (MML) - Rail Replacement ((Bilston & Priestfield (Part 1) and Kenrick Park Tram Stop (Part 2))
key details
| Status | active |
|---|---|
| Category (CPV) | 45234100 |
| Region | West Midlands |
| Deadline | 11 Jul 2023 |
| Contract start | 1 Sept 2023 |
| Contract end | 30 Nov 2023 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-24ec32a8-6a58-4f1d-9e7a-a7fe986675f2 |
description
Midland Metro Ltd (MML) requires a suitably experienced and qualified Provider that can deliver Rail Replacement Services, delivering rail replacement activities to 3 specified locations within a safety critical working environment. Our intention is to enter into a one-off procurement activity.
The appointed provider would be the Principal Contractor and be responsible for providing all required smalls materials, labour, materials movement and works delivery. The 3 locations of Rail Replacement are set out in Part One and Part Two in the Specification. MML reserve the right to award any, or a combination of all 3 locations, or whole, or none at all.
Midland Metro runs from Wolverhampton to Birmingham city centre along 21km with 18km of segregated track. The scope of works is split into two parts. Part 1 and 2:
Part One - Rail Replacement - Priestfield & Bilston Central:
Location 3 - Priestfield
Location 4 - Bilston Central
Part Two - Rail Replacement - Kenrick Park Tram Stop:
Location - 10
A Site visit will take place 20th June 2023, with a 12 noon start and a 14:00 finish. Further information is included in the RFQ.
This Request for Quotation (RFQ) is being evaluated on the basis of Quality 40% / Price 60% and only those organisations that have responded satisfactorily to the Standard Selection Questionnaire will go on to have their tenders assessed.
Budget - There is no specific budget for this project, therefore MML will consider the best value proposals from bidders.
Please also complete the questionnaires in the Qualification envelope and confirm acceptance of the draft Terms and Conditions.
The closing date for submissions is 12.00 noon on 11th July 2023 and the deadline for any clarification questions is 12.00 noon on 4th July 2023.
In order to access the documents and submit your bid please do so through BravoSolution, the WMCA's e-tendering portal (https://wmca.bravosolution.co.uk). The reference is itt_1290 and if you are not already registered on BravoSolution it is free and usually only takes a few minutes to do so.
documents
- https://www.contractsfinder.service.gov.uk/Notice/f1efd202-15bd-4ade-b8a3-b59dc835e760 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Jun 2023 | Tender (tender) | · | f1efd202-15bd-4ade-b8a3-b59dc835e760-653472 |
more from West Midlands Combined Authority
- Provision of Priestfield Mitigations LC084 - Phase 1 - Ballast Distribution Works for Midland Metro Limited (MML) · 14 Jul 2026
- Provision of Cash Collection & Management Services for Midland Metro Limited · 9 Jul 2026
- MOD-ITS-WPG-2026-0001- Modelling works at Cape Hill · £29,600 · 2 Jul 2026
- Sports Quater - Operational Modelling · £51,342 · 2 Jul 2026
- Commercial Management Consultancy Services for the Metro Team - John Bryan · £87,401 · 2 Jul 2026
- Metro Commercial Manager Consultant - Richard Poulter · £90,201 · 2 Jul 2026
- Legal Due Diligence Advisory Services · 25 Jun 2026
- CONSULTANCY SUPPORT SERVICES - BUS REFORM · 11 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Core Valley Lines (CVL) Transformation: Complex track works with associated level boarding works (Contract Details Notice) · Transport for Wales · £9,800,000
- Southern TCODs (Track Circuit Operating Devices) Maintenance · Network Rail Infrastructure Ltd
- Scotland's Railway Slabtrack Repair & Maintenance Framework · Network Rail Infrastructure Ltd
- Network Rail High Speed Buildings and Civils Minor Works Framework · Network Rail High Speed Ltd
- Midlands Rail Hub Alliance – Alliance Partners (Non-Signalling Disciplines) · Network Rail Infrastructure Ltd · £1,380,000,000
- TfW Rail Limited - Stations Modifications and Infrastructure Enhancements Framework · Transport for Wales Rail Limited · £14
- ABANDONED - Phase One and Phase Two Stations Platform Edge Doors Framework Agreement · HS2 · £93,000,000
- CVL Transformation - Rhymney Valley Line Electrification · Transport for Wales · £30,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.