Specification & Installation of Air Handling System to Holland Submarine gallery, RNSM

THE NATIONAL MUSEUM OF THE ROYAL NAVY Published 9 Mar 2017 Contracts Finder

key details

Statusactive
Category (CPV) 31000000 +3 more
Deadline24 Apr 2017
Contract start15 May 2017
Contract end11 Aug 2017
SME suitableNo
OCIDocds-b5fd17-21518601-ad4b-4cf9-b02b-07beddc1b6a6

description

The National Museum of the Royal Navy has identified the need to improve the current air handling system in the environmentally-controlled gallery exhibiting the Holland I submarine. The original system has declined in efficiency and is now potentially detrimental to the preservation of the historic submarine, which is heavily dependent on maintaining the correct environmental conditions. Conservation of ferrous marine metals demands that a low relative humidity be maintained at a constant level, without fluctuations that can be very damaging to the historic fabric. Contractors are invited to specify and install a system to satisfy the target conditions required. Further details of this project are outlined in the brief attached below.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
31 Mar 2017 Tender amendment (tenderAmendment) · ab620924-b7c0-48e9-89d5-b1a79356af1f-138939

more from THE NATIONAL MUSEUM OF THE ROYAL NAVY

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.