gvtcx

BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor

Brighton & Hove City Council Published 18 Jan 2023 Contracts Finder

key details

Value£11,000,000
Statuscomplete
Category (CPV) 45000000
RegionSouth East
Deadline2 Mar 2023
Contract start1 Nov 2023
Contract end30 Apr 2025
Procedureselective
SME suitableNo
OCIDocds-b5fd17-20d4b095-8185-4327-83c8-4f9ea796fec8

Award

SupplierValueDateStatus
J.T.MACKLEY & CO.LIMITED £12,500,000 1 Sept 2024 active

description

Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark. At 865m

long in total it is one of the longest cast-iron structures in the world and an admired piece of

Victorian architecture, integral to the Eastern Seafront. It is also a significant Grade 2* listed

structure within the rich heritage context of the wider coastal city. Phase 1 of the Madeira

Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent

steps and the Shelter Hall / Concord 2.

The cast iron structure forms a backbone describing the historic development of the

seafront. Addressing the sea and the beach firmly braced against the rising East Cliff wall

rising behind. It is a 'backdrop': designed and intended to be used and inhabited by the

residents of the city for all manner of events and social occasions; for quiet enjoyment,

outdoor exercise and for viewing.

The structure is now deemed unsafe and public access has not been possible for a number of

years, due its condition.

The Phase 1 project includes the following elements of works:

  • Conservation and repair of the historic cast iron structure.
  • Conservation and management of the historic Japanese Spindle green wall [dating from

1872], and other planting associated with the Green Wall.

  • Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure

public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure.

  • Public realm landscaping to both the terrace deck above and the promenade walkway

below, including new hard surfacing, soft landscaping and street furniture.

  • Local improvement to Madeira Drive, via new pedestrian crossing points.
  • New lighting and servicing infrastructure
  • Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2

building, to allow its continued historic function as the original means of step-free access to

the terrace.

  • A new external public lift

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
18 Jan 2023 Tender (tender) · f01ed08d-4b86-47be-8a97-3a989b253197-606843
2 Sept 2024 Award (award) · dac98280-6885-48ac-97ec-456174f7a918-781758

more from Brighton & Hove City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.